Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 15, 2023 at 8:00 PM
Updated January 26, 2024
Site work and paving for a transportation facility in Gig Harbor, Washington. Working plans call civil work for a runway / taxiway.
Taxiway Relocation & Stormwater Improvements - Storm Drain Inlet Protection, CSPP Compliance and SPCD, Fill, Cap, and Abandon Existing Pipe , Remove Valley Gutter, Remove Drainage Structure ,Asphalt Pavement Removal, Pavement Pulverization, Paint Marking Removal, Lighted Sign Demolition , Remove Tree, Crushed Aggregate Base Course, Asphalt Surface Course , Catch Basin Type 1, Catch Basin Type 2 48 In. Diam., Adjust Manhole or Catch Basin, 8' Chain-Link Fence, 4' Pedestrian Gate with Concrete Pad, 20' Double Swing Gate with Concrete Pad FAAAIPNos.3-53-0076-023-2022&3-53-0076-024-2023 The DBE goal for this project is 9.24% Goals for minority participation for each trade: 6.2% Goals for female participation in each trade: 6.9% Contract Time The number of calendar days or working days, stated in the proposal, allowed for completion of the contract, including authorized time extensions. If a calendar date of completion is stated in the proposal, in lieu of a number of calendar or working days, the contract shall be completed by that date.
Final Planning
Transportation Terminals
$13,943,625.00
Public - County
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 2, 2023
August 1, 2023
1202 26th Ave NW, Gig Harbor, WA
Related To This Project
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
