Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 10, 2023 at 7:00 PM

Updated January 26, 2024

Renovation of an educational facility in Mililani, Hawaii. Completed plans call for the renovation of a educational facility.

Mililani Mauka Elementary, Install Window A/C Units Phase II Questions Deadline: 02/10/2023 questions regarding this solicitation must be directed, via email or phone, to the Contact Person. TASHA TANDA Email: tasha.tanda@k12.hi.us Phone Nbr: 808-305-4240 Furnish materials, labor and equipment necessary to install new window A/C units at Wahiawa Middle School. This job is for the replacement of Eight (8) Window A/C units, 2ea in portable buildings P-1 to P-4 I. Window Air Conditioning Units: a. All window A/C units shall be 18,000btu LG Dual Inverter series or a preapproved equal. b. Window A/C units will be framed with treated 2 x 4 and shall have minimum 1/2 " ACX treated plywood on the interior and exterior. c. All wood around the A/C units will be caulked and painted (interior and exterior). III. Condensation Drain lines a. All a/c units shall have a 1/2 " PVC drain lines. b. All drain lines shall be strapped securely to the wall and run from the a/c unit to approximately 6" above the existing finish grade. III. Electrical: a. This a replacement of the 8 a/c units and electrical work shall be only as necessary. b. Contractor shall provide all necessary components for a complete installation of all A/C units; including but not limited to conduits, wiring, outlets, breakers, etc. IV. Patching a. All penetrations through walls/windows shall be completely sealed b. All added and/or replaced lumber and/or plywood shall be patched and painted. Wood trim shall be used for gaps larger than 1/4 inch. c. Any damages caused by the Contractors work shall be properly patched and painted to match surrounding areas Clayton Haida (808) 271-4774 Clayton.Haida@k12.hi.us

Award

Educational

$17,465.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
71
Active Projects
21
Bidding Soon
328
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 16, 2023

April 17, 2023

Project location map

95-1111 Maka?ika?i St, Mililani, HI


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed