BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 26, 2025 at 8:00 PM

Updated June 27, 2025

Site work and paving for a mixed-use development in Fowler, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

**As of June 26, 2025, the project is on hold. No definite date for the rebid.** Question Deadline 04/23/2025 at 2:00 PM PT Scope of work includes full compensation for all labour, materials, tools, equipment, and incidentals to furnish and install signage and striping to add new bike lanes and facilities on several streets within the City of Fowler. Contractor shall furnish and install improvements to include new thermoplastic crosswalks, green and white bike lane markings, parking stall striping, painted red curbs, and bike lane signage. Concrete flatwork shall be constructed for bike repair and air-filling, as well as for bike racks installed as part of this project. Additionally, the contractor shall remove all conflicting striping within the project area. All Improvements are shown in the project drawings in Appendix B- Bikeway to Transit Plans. All items shall be removed or constructed per City of Fowler standard drawings and specifications. In accordance with the provisions of Section 1770 of the Labour Code, the Director of the Department of Industrial Relations of the State of California has determined the general prevailing rates of wages and employer payments for health and welfare, pension, vacation, travel time, and subsistence pay as provided for in Section 1773.8, apprenticeship or other training programs authorized by Section 3093, and similar purposes applicable to the work to be done. Said wage determinations are on file with the City Clerk and are incorporated herein by reference. Bid security in the amount of then (10) percent of the amount of the bid, and in the form of a bid bond issued by an admitted surety insurer licensed by the California Department of Insurance, cash, cashier's check or certified check shall accompany the bid. Bid security shall be made in favor of the City of Fowler. The successful bidder shall furnish a faithful performance and labour and materials bonds each in the amount of 100 percent of the contract amount. Said bonds shall be issued by a surety company who is an admitted surety insurer authorized by the California Department of Insurance to transact business in this state, and acceptable to the City of Fowler. The right is reserved to reject any and all proposals. Inquiries regarding this project should be directed to Soo Ho Park, City Engineer at spark@ppeng.com. O

Post-Bid

Roads / Highways

$240,000.00

Public - City

Paving, Site Work

14

11

2

2

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
106
Active Projects
58
Bidding Soon
698
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 1, 2025

May 21, 2025

Project location map

Multiple Locations, Fowler, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.