BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Rome, New York. Working plans call for site work for a road / highway; for paving for a road / highway; water / sewer project; sidewalk / parking lot; and sidewalk / parking lot.

*This project has been postponed.* Description : The City of Rome intends to complete BOA predevelopment activities along Muck Road within the Erie Boulevard BOA. The project involves the planning and design for the extension of the Empire State/Canalway Trail along Muck Road through the public ROW and State-owned lands fronting the Barge Canal. Project tasks include designing stormwater collection and treatment facilities, designing an AASHTO-compliant recreational facility, and incorporating complete streets principles into the trail design. Total Budget : $150,000 The total budget for the project is $150,000. MWBE goals are based only on the state funding amount. The MWBE cost example shown below is based on the $150,000 total budget and the full $135,000 state allocation. If the proposed budget is less than $150,000, the MWBE amount will be reduced to reflect 30% of the state allocation. The selected consultant will be required to provide professional liability insurance of at least $1 million per occurrence and $2 million aggregate and proof of worker's compensation and disability coverage. The selected consultant will be required to enter into a professional services agreement provided by the City of Rome through the Board of Estimate and Contract legislative process. The City of Rome reserves the right to reject any and all proposals in the best interest of the City. Only complete submissions will be considered. Any questions regarding the RFP should be directed to Danielle Salisbury, Planner, at (315) 838-1726 or dsalisbury@romecitygov.com

Final Planning

Roads / Highways

$44,700.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
116
Active Projects
47
Bidding Soon
726
All Active Projects
377
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 9, 2023

June 28, 2024

img_map_placeholder

Muck Rd, Rome, NY

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.