BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and paving for a civil project in Los Gatos, California. Completed plans call for site work for a bridge / tunnel; water / sewer project; and for paving for a bridge / tunnel.

The Bear Creek Redwoods Phase II Project consists of land slide repairs, replacement of a culvert, removal of a culvert, creek channel restoration, installation of a water supply line, and the installation of two bridges as further detailed and described herein as the Contract Documents. In consideration of District's reliance on and investigation and consideration of the Bid Proposal of the undersigned, the undersigned agrees that such Bid shall be irrevocable and shall not be withdrawn for sixty (60) calendar days following the Bid opening even though an award is made to another Bidder. Thereafter, such Bid shall be automatically relieved. Scope of Work: The Slide #2 repairs consist of the installation of a retaining wall supported by cast-in-place drilled soldier pile foundation. The slide #3 repairs consist of the installation of subsurface drainage, vegetated bench terraces, and rock riprap supported slopes in order to prevent further incising of the slope and further erosion. Crossing #3 consists of the removal of an existing concrete culvert and headwall, and the installation of a 60" HDPE culvert, two concrete headwalls, and two guardrails. Creek restoration at Crossing #4 consists of the removal of trees and piping from the creek channel, grading and reshaping of the creek channel, and the installation of a rock mix to form the new creek base. Bridge # 6 will consist of the construction of a 65 LF x 12 LF concrete vehicular bridge. Bridge #7 will consist of the construction of a 55 LF x 12 LF concrete vehicular bridge, including concrete wing wall abutment footings and rock slope protection. The water supply line scope of work consists of installing 2,000 linear feet of 4" water line in a trenched channel with thrust blocks as further detailed and described herein as the Contract Documents February 17, 2023 11:00 a.m. - Deadline for Bidders to pose questions. The Bear Creek Redwoods Phase II Project consists of land slide repairs, replacement of a culvert, removal of a culvert, creek channel restoration, installation of a water supply line, and the installation of two bridges as further detailed and described herein as the Contract Documents. For additional information, contact Zachary Alexander, Capital Project Manager III, Midpeninsula Regional Open Space District, 5050 El Camino Real, Los Altos, CA 94022-1404; (650) 625-1200 or zalexander@openspace.org.

Award

Bridges / Tunnels

$1,966,750.00

Public - State/Provincial

Paving, Site Work

64

9

27

5

Subscribe For Documents

46 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
126
Active Projects
67
Bidding Soon
1,403
All Active Projects
612
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 2, 2023

May 1, 2023

img_map_placeholder

19521 Bear Creek Rd, Los Gatos, CA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.