BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 11, 2025 at 8:00 PM

Updated September 12, 2025

Site work and paving for a road / highway in Immokalee, Florida. Design plans call for site work for a road / highway; and for paving for a road / highway.

417540-5 As of September 11, 2025, an engineer has been selected and this project is in the design phase. Design will be complete in June of 2027. Estimated timeline for bidding is in June 2027. It is project construction will start mid 2027 and end early 2031. This project will construct a new alignment of S.R. 29 as a four-lane divided roadway to serve as a loop around the downtown Immokalee area. The design will have four 12-foot travel lanes with curb and gutter on both sides, a 22-foot median, and 12-foot shared use paths on both sides. The project also includes drainage improvements along the entire length of the corridor. As of April 11, 2023, this project is in the conceptual phase. Information regarding a design firm and the general contractor selection timeline has not been disclosed. Although a firm timeline for construction has not been determined, construction is not expected to start prior to spring of 2027. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed. *The engineer, Patel, Greene & Associates, will not accept phone call inquiries at this time. The point of contact is owner Sean Pugh.

Design

Roads / Highways

$61,600,000.00

Public - State/Provincial

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
310
Active Projects
154
Bidding Soon
2,144
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 1, 2027

Project location map

FL-29, Immokalee, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.