BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a water / sewer project in San Marino, California. Completed plans call for site work for a water / sewer project.

Est. Value Notes: $3,000,000-$4,600,000 The District encourages participation in its construction contracting by all members of the community including MinorityBusiness Enterprises(MBE), Women Business Enterprises (WBE), Disadvantaged Business Enterprises (DBE), Disabled Veterans Business Enterprises(DVBE) and Small Business Enterprises(SBE). The District has established an aspirational goal of 20% overall participation by such firms. located in the Cities of San Marino, San Gabriel and Alhambra, California. The work consists of rehabilitation of approximately 9,830 feet of existing 15 to 24inch diameter nonreinforced concrete pipe (NRCP), vitrified clay pipe (VCP), and reinforced concrete pipe (RCP) with curedinplace pipe (CIPP) liner, rehabilitation of approximately fortysix (46) manholes/structures with a protective coating system, and all appurtenant work. To attend the jobsite walkthrough, each attendee shall submit signed copies of the District's "COVID19 SelfScreening Policy" to the District's Engineer as soon as they arrive at the site. Wearing face masks and practicing social distancing during the walkthrough are strongly recommended. The Board of Directors may reject all bids. Unless all bids are rejected, award will be made to the low, responsive, responsible bidder. The work of construction must be completed within 180 WORKING DAYS after the date in the Notice to Proceed. Pursuant to provisions of the Labor Code of the State of California, not less than the general prevailing rate of per diem wages and not less than the general prevailing rate of per diem wages for legal holiday and overtime work for each craft or type of workman needed to execute the work contemplated under the agreement, as ascertained by the Director of the Department of Industrial Relations, must be paid to all workers employed on the work by the Contractor or by any subcontractor doing or contracting to do any part of the work. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Water / Sewer

$1,643,353.00

Public - County

Site Work

27

3

3

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
204
Active Projects
105
Bidding Soon
2,244
All Active Projects
1,000
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 7, 2023

May 8, 2023

img_map_placeholder

Multiple Locations, San Marino, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.