BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a playground / park / athletic field in Rochester, Michigan. Completed plans call for site work for a playground / park / athletic field.

Rochester Community Schools Rochester Community Schools will be accepting proposals for the following: 23.04 Playground Fencing Improvements Bid Bond: 5% Bid Bond naming Rochester Community Schools as the obligated, or Certified Check made payable to Rochester Community Schools, required. Bid Bonds shall be issued by a company licensed to do business in the State of Michigan. Bonding Requirements - Bid Bond 5 Online Requests for Clarification Deadline: February 15, 2023 at 5:00 p.m. Local Time Rochester Community Schools, known herein as "Owner", seeks proposals from qualified for the installation of artificial turf playground surfacing and vinyl coated chain link fencing located at the following 9 buildings. o Baldwin Elementary School: 4325 Bannister, Rochester Hills, MI 48306 o Delta Kelly Elementary School: 3880 Adams Road, Oakland Twp., MI 48363 o Hamlin Elementary School: 270 W. Hamlin Road, Rochester Hills, MI 48307 o Hampton Elementary School: 530 Hampton Circle, Rochester Hills, MI 48307 o Hugger Elementary School: 5050 Sheldon, Rochester Hills, MI 48306 o Long Meadow Elementary School: 450 Allston, Rochester Hills, MI 48309 o McGregor Elementary School: 1101 W. First Street, Rochester, MI 48307 o Musson Elementary School: 3500 Dutton, Rochester Hills, MI 48306 o Caring Steps Childcare Center: 3838 N. Rochester, Oakland Twp. 48306 The scope of the project is to provide new fencing that will be installed to secure playground areas as listed in this Request for Proposal. Scope varies from location to location and can include removing or reworking existing fencing and or providing and installing new or relocated gates. This may include either chain link fencing or aluminum fencing. Note: Scope includes patching all areas affected by either the new installation or the removal of existing fencing. This patching would include, but is not limited to lawn areas, concrete areas, brick, etc. Refer to scope descriptions below as well as shown and described in Attachment 'A' in conjunction with the 'Chain Link Fencing Specifications' contained in this Request for Proposal. It will be the responsibility of the awarded contractor to verify scope and field measurements with the Owner prior to ordering material. Refer to Attachment 'A' for aerial photos of each site showing the location of new fencing as follows. 1. Baldwin Elementary School a. Provide and install 70 lineal feet of new aluminum fencing to match and tie into the existing bronze tone \ black fencing to completely enclose the existing Pre-K playground area. Provide a 48" wide gate for pedestrian access. b. Provide and install 10 lineal feet of new of chain link fencing. New galvanized chain link fencing to connect to the building and tie into the exiting chain link fencing. Provide and install a 48" wide gate for pedestrian access. c. Remove and replace 340 lineal feet of existing chain link fencing along Collins Road. Provide and install 2 gate openings. One gate to be 48" wide and the other to be a double gate to provide a 84" opening. New fencing to be black vinyl coated chain link fencing. Tie new fencing into the existing fencing in two locations. 2. Delta Kelly Elementary School a. Provide and install 370 lineal feet of fencing to enclose the southwest playground area. New fencing to be 48" high vinyl coated chain link fencing. Provide two gate entrances. One 48" wide gate for pedestrian access and one double gate providing an 84" wide opening for maintenance equipment access. 3. Hamlin Elementary School a. Provide and install 205 lineal feet of fencing to enclose an area east of the existing playground. New fencing to be 48" high black vinyl coated chain link fencing to match existing. Tie new fencing into the existing fencing in two locations. b. Remove 77 lineal feet of existing chain link fencing running north \ south on the east end of the existing playground. 4. Hampton Elementary School a. Provide and install 51 lineal feet of 48" high black vinyl coated chain link fencing between two sections of the building to enclose a courtyard area. Provide a double gate that will allow one section to be opened at 48" for pedestrian traffic and the other 48" wide gate adjacent to that to allow the gate opening to be 84" wide to allow mowing and maintenance equipment access. b. Remove 400 lineal feet of existing 48" high chain link fencing and posts. Provide and install 400 lineal feet of new 48" high black vinyl coated chain link fencing. Provide and install two (2) 48" wide gates in the new fencing. Gate locations to be determined in field. 5. Hugger Elementary School a. Provide 770 lineal feet of fencing to enclose playground area. New fencing to be 48" high black vinyl coated chain link fencing. Provide three gate entrances. Two, separate 48" wide gates for pedestrian access at the two sidewalk areas and one double gate providing a 84" wide opening for maintenance equipment access. 6. Long Meadow Elementary School a. Provide and install 370 lineal feet of fencing to partially enclose the playground area. New fencing to be 48" high vinyl coated chain link fencing. Tie one section of the new fencing into the existing fencing. b. Remove approximately 82 lineal feet of existing chain link fencing. 7. McGregor Elementary School a. Provide and install 175 lineal feet of new fencing. New fencing to be 48" high black vinyl coated chain link fencing. 8. Musson Elementary School a. Provide and install 402 lineal feet of fencing to enclose a larger area of the existing playground. New fencing to be 48" high black vinyl coated chain link fencing to match existing. Tie new fencing into the existing fencing in two locations. Relocate two existing gates removed from an existing section of fencing. b. Remove 88 lineal feet of existing chain link fencing, including 2 48" wide gates. 9. Caring Steps Childcare Center: a. Provide and install 100 lineal feet of fencing to enclose an area east of the existing playground. New fencing to be 48" high black vinyl coated chain link fencing to match existing. Tie new fencing into the existing fencing. b. Remove 70 lineal feet of existing chain link fencing running north \ south on the east end of the existing playground.

Award

Playgrounds / Parks / Athletic Fields

$123,063.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
162
Active Projects
102
Bidding Soon
1,416
All Active Projects
604
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2023

March 31, 2023

img_map_placeholder

Multiple Locations, Rochester, MI


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.