BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition and site work for an educational facility in Gibsonia, Pennsylvania. Completed plans call for the demolition of a educational facility; and for site work for a educational facility.

Contract No. DGS 0406 - 0060 Phase 1.1 - General Construction Contract Number................................. C-0406-0060.1 - General A. The Work of this Project consists of, but is not necessarily limited to, the following. Detailed requirements of the Work are described in the pertinent specification Sections and/or shown on the Drawings. B. General Construction (.1) Contract: 1. Hazardous materials abatement as indicated. 2. Full facility demolition of the Miller Research Center, Rose Hall, Dearborn Hall, Earp Hall, Centennial Hall, Earlley Hall, and Boiler House facilities 3. Regrading and restoration of all seven sites following removal of buildings. 4. Reconstruction and extension of sidewalks, curbs, etc, following the removal of buildings. 5. Disconnection of each facility slated for demolition from campus utilities, including, but not limited to, steam, sanitary, stormwater, and domestic water lines. 6. Disconnection of each facility from incoming electrical services, including general make safe activity prior to demolition. ESTIMATED RANGE: .1 General - $6,000,000 - $7,000,000 LIQUIDATED DAMAGES = (.1) $1,750.00 per day per day. There is no Bid Guaranty required for this Project. The Department of General Services Public Works and the Bureau of Diversity, Inclusion and Small Business Opportunities (BDISBO) identified this procurement as eligible for the setting of Small Diverse Business (SDB) and/or Veteran Business Enterprise (VBE) participation goals. However, BDISBO did not set SDB and/or VBE participation goals for those procurements that are less than the $400,000 threshold required to set either goal. In addition, there will be no points allocated toward SDB/SB participation for this procurement. This is a significant programmatic change from the SDB and SB Participation program contained in prior Projects issued by Public Works. Bidders now must agree to meet the SDB and VBE Participation Goals in full or demonstrate that they have made Good Faith Efforts to meet the Goals. Refer to the Instructions to Bidders section regarding Small Diverse Business and Veteran Business Enterprise Participation for further information. The Goals for each Prime Contract is as follows: SDB AND VBE GOALS .1 General Construction - ALL BASE BIDS (#1 & #2) SDB = 0% VBE = 0% All proposers must be registered to view/download Plans and Specifications and must have a Current, Active Vendor Number. To register click the following link: register Duration: 404 Calendar Days from date of initial job conference *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The Work of this Project consists of, but is not necessarily limited to, the following. Detailed requirements of the Work are described in the pertinent specification Sections and/or shown on the Drawings. B. General Construction (.1) Contract: 1. Hazardous materials abatement as indicated. 2. Full facility demolition of the Miller Research Center, Rose Hall, Dearborn Hall, Earp Hall, Centennial Hall, Earlley Hall, and Boiler House facilities 3. Regrading and restoration of all seven sites following removal of buildings. 4. Reconstruction and extension of sidewalks, curbs, etc, following the removal of buildings. 5. Disconnection of each facility slated for demolition from campus utilities, including, but not limited to, steam, sanitary, stormwater, and domestic water lines. 6. Disconnection of each facility from incoming electrical services, including general "make safe" activity prior to demolition. Full facility demolition of seven (7) underutilized or otherwise obsolete buildings at PennWest Edinboro's campus Question Deadline 03/14/2023 Questions during the bid stage shall be submitted via e-Builder under the Q&A Board tab in the Package's Invitation to Bid. Bid Results Base Bid 1 Safeco Services - $2,523,890.25 Base Bid 2 Reclaim Company LLC - $638,828.00

Bid Results

Educational

$3,162,718.00

Public - State/Provincial

Demolition, Site Work

79

19

543

4

Subscribe For Documents

49 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
74
Active Projects
37
Bidding Soon
810
All Active Projects
311
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 24, 2023

May 23, 2023

img_map_placeholder

200 Tartan Rd, Gibsonia, PA

Related To This Project


Stop wasting time. Get and stay ahead of your competition.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.