BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and renovation of an educational facility in Arcata, California. Completed plans call for the renovation of a educational facility; and for site work for a educational facility.

In general, the work consists of the demolition and replacement of multiple generation units throughout the university and associated work per the plans and specifications prepared by Suarez-Kuehne Architects. Any questions should be made in writing to Addie Dunaway at Addie.Dunaway@humboldt.edu before 5:00 p.m. on Monday, February 20, 2023 Bidders must be prequalified with the Trustees and submit their prequalification applications no less than ten (10) business days prior to the bid due date of March 9, 2023. The Trustees require the successful bidder to achieve three percent (3%) DVBE participation in contracting construction projects as established in the bidding documents, and bidders shall identify the DVBEs to be used to satisfy this requirement in their bids. The Trustees use allowances for specific and discrete scopes of Work that are indeterminate at time of bid and may cause allowances to be included in the base bid as estimates for this Work. Examples of allowances include but are not limited to keying, hard rock excavations, special utility permits or utility connection fees. The Trustees shall authorize each debit from an allowance in writing, using a field instruction. Debits from allowances and mark-ups on allowance work performed by subcontractors shall be in accordance with this Article 6. Since allowances are a part of the base Contract Work, Trustees will not award additional mark-up to Contractor for work performed within the allowance by Contractor or any subcontractor. Contractor shall include a six-percent mark-up on a credit change order for any unused portion of an allowance. Work performed in excess of an allowance is subject to normal mark-ups in accordance with this Article 6. The time period for completion of the overall project shall be 180 calendar days from the construction start date as stated on the Notice to Proceed. Liquidated damages shall be $1,000 for each calendar day completion is delayed beyond the time prescribed for the project. Work Included in the Contract: All coordination, construction, and services required for the Cal Poly Humboldt - Library - Flat Roof Replacement project located in Arcata, California including, but not limited to the following: 1. Provide all labor, equipment and materials necessary to complete Cal Poly Humboldt Library Flat Roof Replacement including: demolition of existing roof surface, installation of insulation, new roof surface and roof traffic walk pad; adjusting and re-anchoring of existing roof vents and equipment onto raised curbs; demolition and removal of an existing generator and associated piping; removal of debris; replacement of existing roof drains and installation of additional overflow roof drains, sensors and notification system and associated plumbing and electrical services; removal, patching and installation of cementitious plaster walls; painting of walls and exposed piping; design and installation of a fall protection roof anchorage system as described within the drawings and technical documents and other information included herein. 2. Contractor shall be responsible to protect adjacent areas and furniture from dust, smells, and noise pollution resulting from construction activities, using a method that meets University approval prior to installation. 3. Contractor shall be responsible to field verify all dimensions. 4. Contractor shall access the area of construction only through those entries designated within the Construction & Laydown Area Map. Should operations require access via other entries, such shall be coordinated and authorized, in advance, with the University's Project Manager

Award

Educational

$1,708,458.00

Public - State/Provincial

Renovation, Site Work

28

14

39

3

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
2
Active Projects
1
Bidding Soon
34
All Active Projects
12
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 9, 2023

April 10, 2023

img_map_placeholder

1398 B St, Arcata, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.