BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and outdoor lighting for a civil project in N Riverside, Illinois. Design plans call for site work for a bridge / tunnel; for outdoor lighting for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; road / highway; and water / sewer project.

As of December 26, 2023, a design team has been selected. Construction timeline has not been identified. Job No. C-91-122-12, IL 43, Harlem at US 12/20 (95th St), Phase III Project, Cook County, Region One/District One. This project requires 25% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. The Complexity Factor for this project is 0. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on May 4, 2023, at 10:30 AM at the Region One/District One Office in Schaumburg. Phase III engineering services includes, but is not limited to, the construction of a pump station, bridge rehabilitation and reconstruction, roadway widening and construction, traffic signal, lighting, and drainage improvements. The interchange will be reconfigured to a partial cloverleaf pump station. The new pump station will be constructed east of the existing pump station. The various bridges will contain scope including, but not limited to, raising vertical profiles to increase clearances, stringer repairs, abutment modifications, approach slab replacements, concrete pier repairs, superstructure replacements, and deck replacements. WB 95th street will be widened to accommodate a 3rd lane from Harlem Ave. to I-294. New traffic signals will be constructed at the two ramp intersections on Harlem Ave. Roadway lighting is proposed for 95th street, Harlem Ave., and all ramps with new storm water drainage structures and detention basins, any and all incidental and collateral work necessary to complete the improvement. The anticipated construction completion date is October 31, 2025. The Consultant must complete and submit final measurements, calculations, and final contract records documents to the department no later than six (6) weeks after the completion of the project. The Prime firm must be prequalified in the Special Services (Construction Inspection) category to be considered for this project. Statements of Interest, including resumes of only the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The method of contractor selection has not been determined at this time. IDOT - 10 - RFQ - RFQ Engineering - IL 43, Harlem at US 12/20 (95th St), Phase III Project, Cook County, Region One/District One

Design

Bridges / Tunnels

$8,000,000.00

Public - State/Provincial

Outdoor Lighting, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
383
Active Projects
233
Bidding Soon
3,202
All Active Projects
1,313
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

February 23, 2024

October 31, 2025

img_map_placeholder

IL-43, N Riverside, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.