BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 26, 2023 at 7:00 PM

Updated December 27, 2023

Site work and paving for a mixed-use development in Mokena, Illinois. Design plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; sidewalk / parking lot; and sidewalk / parking lot.

As of December 26, 2023, a design team has been selected. Construction timeline has not been identified. Job No. C-91-115-22, I-80: River Rd to Houbolt Rd, Phase III Project, Will County, Region One/District One. This project requires 25% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. The Complexity Factor for this project is 0. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on May 4, 2023, at 9:00 AM at the Region One/District One Office in Schaumburg. Phase III engineering services includes, but is not limited to, reconstruction of the existing I-80 mainline pavement from west of River Road to east of Houbolt Road and the partial reconstruction of the entrance and exit ramps at the I-80 and I-55 interchange and the W. Frontage Road, reconstruction and widening of the Eastbound/Westbound I-80 Bridges over DuPage River, Eastbound/Westbound I-80 Bridges over Frontage Road, Eastbound/Westbound I-80 Bridges over I-55, and Eastbound/Westbound I-80 Bridges over Rock Run Creek, ramp work includes construction of new Eastbound/Westbound I-80 Brides over future Ramp AA, any and all incidental and collateral work necessary to complete the improvement. The anticipated construction completion date is October 31, 2026. The Consultant must complete and submit final measurements, calculations, and final contract records documents to the department no later than six (6) weeks after the completion of the project. The Prime firm must be prequalified in the Special Services (Construction Inspection) category to be considered for this project. Statements of Interest, including resumes of only the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The method of contractor selection has not been determined at this time. IDOT - 16 - RFQ Engineering - I-80: River Rd to Houbolt Rd, Phase III Project, Will County, Region One/District One

Design

Bridges / Tunnels

$8,000,000.00

Public - State/Provincial

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
454
Active Projects
257
Bidding Soon
3,345
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 23, 2024

Project location map

Interstate 80, Mokena, IL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.