BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Sedalia, Colorado. Completed plans call for site work for a water / sewer project.

Question Acceptance Deadline 03/03/2023 07:00 PM EST Questions are submitted online No Castle Rock Waters long-term goal is to provide a sustainable, reliable and renewable water supply for all of Castle Rocks citizens and businesses. Renewable water storage plays a primary role in Castle Rock Waters long-term renewable water plan. As part of this water supply plan, the Town of Castle Rock purchased surface water diversion, pumping, and raw water storage facilities located on Plum Creek near the Town of Sedalia. The diversion point is downstream from the confluence of East and West Plum Creek, which will allow the Town to maximize the use of its water rights, including reusable supplies and native supplies owned in East and West Plum Creek. Existing facilities include a diversion structure, two pump stations and a raw water storage reservoir, Castle Rock Water Reservoir No. 1 (CRR1-240 acre-feet capacity). The diversion structure provides for the controlled diversion of water from Plum Creek to the Plum Creek Pump Station, which delivers water to CRR1 and to the Ravenna Pump Station (RPS). Construction of the Plum Creek Diversion Pump Station (PCDPS) was completed in August 2020, which replaced the existing Plum Creek Pump Station, and pump raw water from Plum Creek to CRR1 and from CRR1 to Plum Creek Water Purification Facility (PCWPF). In accordance with the Water Resources Strategic Master Plan, Castle Rock Water is planning to construct Castle Rock Reservoir No. 2 (CRR2780 acrefeet capacity) immediately east of CRR1. This new reservoir will help Castle Rock Water to accommodate daily high demands during summer months in the coming years and as an additional storage vessel for those times when Castle Rocks junior surface water rights are in priority, or when free river conditions exist. CRR2 will be constructed at 5219 Rio Grande Ave, Sedalia, CO 80135. This 145-acre land parcel (Douglas County Parcel No. 2353-151-00-001) is owned by the Plum Creek Trust and is categorized as agricultural land. In addition to the construction of CRR2, the Town also intends to expand and rehabilitate the existing CRR1 reservoir to approximately 550 acre-feet

Post-Bid

Water / Sewer

$2,000,000.00

Public - City

Site Work

177

21

6

4

Subscribe For Documents

180 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
86
Active Projects
45
Bidding Soon
876
All Active Projects
391
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 17, 2023

May 8, 2023

img_map_placeholder

Multiple Locations, Sedalia, CO


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.