BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a laboratory facility in Morgantown, West Virginia. Completed plans call for the renovation of a laboratory facility.

Question Submission Close Date 2/14/2023 12:00 PM EST West Virginia University on behalf of its Board of Governors ("BOG") located in Morgantown, West Virginia ("WVU" or "University") is initiating this Request for Bids ("RFB") from qualified, experienced, and licensed Contractors for the partial build-out of the Shell Space Room 1100 which includes (but is not limited to) the design and install HVAC (for Lab 1101 and the Equipment Room 1101A) and Casework (room G11). See attached for more details NOTE: Required Completed Documentation must be submitted under SUPPLIER ATTACHMENTS with Response (bid bond, drug-free affidavit, etc.). NOTE: Questions MUST be submitted directly on the solicitation website on the Q&A Board - Please refrain from submitting questions until AFTER the Pre-Bid meeting NOTE: Addenda will be posted on the Q&A Board; while the system should generate an automatic email, please be sure to visit the site regularly during this solicitation. Cutoff for Questions: Date: February 14, 2023 Time: 12:00 pm EST The bid/proposal process is highly controlled. To protect the integrity of the process, any questions or clarifications regarding this Request for Bid/Proposal must be handled through the Department of Procurement, Contracting, & Payment Services. The Contractor shall achieve Substantial and Final Completion of the entire Work as calculated or indicated below. The date of issuance of the West Virginia University's Notice to Proceed and/or Contact shall be used to calculate Substantial and Final Completion if contract time stated below is in number of calendar days. Substantial Completion shall be Four (4) months after Award Final Completion shall be One (1) month after Substantial Completion. Final Completion is considered when project site is de-mobilized and all project documents listed in Close-Out section of the specifications has been sent to the owner. The Contractor shall achieve Substantial and Final Completion of the entire Work as calculated or indicated above. The date of issuance of the West Virginia University's Notice to Proceed or Executed Agreement shall be used to calculate Substantial and Final Completion of contract time stated in number of consecutive calendar days or established date. Time is of the essence. Liquidated Damages shall be Five Hundred Dollars ($500) per Calendar Day of delay in achieving Substantial Completion and Two Hundred and Fifty Dollars ($250) per Calendar Day of delay in achieving Final Completion. The following Bonds will be required with award: Performance Bond Labor and Material Bond Visitors and Contractors Self-Screening Checklist The safety of West Virginia University's campus community remains our top priority. As the COVID-19 pandemic continues to evolve and spread, WVU is monitoring the situation closely and will periodically update its policies and procedures based on current guidance from the Centers for Disease Control and Prevention (CDC), the World Health Organization and other federal, state and local agencies.

Bid Results

Laboratories

$277,800.00

Public - State/Provincial

Renovation

4

8

18

3

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
206
Active Projects
103
Bidding Soon
1,359
All Active Projects
706
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

February 22, 2023

March 24, 2023

August 31, 2023

img_map_placeholder

148 Willey St, Morgantown, WV

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.