BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a mixed-use development in Brantford, Ontario. Completed plans call for the construction of a 153,000-square-foot, two-story above grade educational facility; for site work for a educational facility; and 12,000-square-foot, one-story above grade day care center.

It is the intent of the Board to prequalify Contractors to be utilized for the construction of a new two storey Catholic secondary school facility located in Brantford, Ontario. Request for Tender is planned for July 2024 and project completion by summer of 2026. The Board intends to utilize a design-bid-build project methodology (CCDC 2 - 2020 and Supplementary Terms and Conditions) with a stipulated price where a single Design Services consultant (already retained by the Board) and a single General Contractor will be engaged directly by the Board for all work contemplated. The Board reserves the right to limit the number of Contractors (in each of the 3 categories) prequalified as part of this RFSQ process. The Brant Haldimand Norfolk Catholic District School Board is currently in the design phase of a new two-storey Catholic secondary school facility with a Child Care Centre located in Brantford, Ontario. A new, green field secondary school facility constructed within the last 10 years with a size of approximately 165,000 sq ft in gross floor area comprised of: - A two-storey Catholic Secondary School with an approximate gross floor area of 153,000 sq ft. - A single-storey Childcare Centre with an approximate gross floor area of 12,000 sq ft. The facility will be home to approximately 1,257 students and will include typical classrooms, administrative spaces and Technology / Specialty Trade / Science / Art / Computer / Cosmetology classrooms, a triple gymnasium with change rooms, theatre, library, cafeteria and chapel. The Childcare Centre will include infant, toddler and pre-school care rooms and support spaces. Car Parking, bus layby areas, access ways and outdoor amenities serving the facility will be provided including outdoor sports field and 8-lane running track, landscape areas open space recreation areas, walkways, fencing and lighting. Documents can be obtained at: https://bhncdsb.bidsandtenders.ca TIMELINE: RFQ has closed; as of July 11, 2024, seven (7) General Contractors have prequalified. The Board will not be moving forward with the prequalification of the mechanical and electrical contractors through this process. Prequalified General Contractors are advised that prequalified lists for mechanical or electrical contractors will not be provided at the time of tender. As of August 7, 2024, the Stage II Invitation to Bid (ITB) timeline to the prequalified firms has yet to be issued or confirmed by the owner. Stage II will be advertised on the Bids and Tenders website; timelines have not yet been identified by the Board. Project completion by summer of 2026.

Post-Bid

Educational

$45,700,000.00

Public - State/Provincial

New Construction, Site Work

3

4

4

Subscribe For Documents

34 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
414
Active Projects
209
Bidding Soon
3,871
All Active Projects
1,459
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

June 13, 2024

September 2, 2024

August 31, 2026

img_map_placeholder

353 Powerline Rd, Brantford, ON

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.