EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 8, 2023 at 7:00 PM

Updated January 26, 2024

Site work for a water / sewer project in Lake Charles, Louisiana. Completed plans call for site work for a water / sewer project.

The Calcasieu Parish Police Jurys Purchasing Agent, on behalf of Waterworks District No. Five of Wards Three and Eight of Calcasieu Parish, Louisiana, does hereby advertise for sealed bids For the HWY 397 and James Sudduth Road Waterline Loop and Replacement Project Project No. SD-2022-WW5-220. *Prime bidders is defined as licensed Municipal and Public Works Contractors bidding this job as such. 5.Preference is given to materials, supplies, and provisions that are produced, manufactured, or grown in Louisiana, quality being equal to articles offered by competitors outside the State. 6.All bids must be accompanied by bid security equal to five percent (5%) of the sum of the base bid and all alternates, and must be in the form of a certified check or cashiers check drawn on a bank insured by the FDIC, or the Special District Bid Bond Form contained in bidding documents, which shall be written by a surety or insurance company currently on the U.S. Department of the Treasury Financial Management Service list of approved bonding companies which is published annually in the Federal Register, or by a Louisiana domiciled insurance company with at least an A- rating in the latest printing of the A.M. Bests Key Rating Guide to write individual bonds up to ten percent (10%) of policyholders surplus as shown in the A.M. Bests Key Rating Guide or by an insurance company in good standing licensed to write bid bonds which is either domiciled in Louisiana or owned by Louisiana residents, all in accordance with LSA R.S. 38:2218. No Bid Bond indicating an obligation of less than five percent (5%) by any method is acceptable. If bid is submitted electronically, an electronic bid bond as described in LSA--R.S. 38:2212 E.(1) per the standards adopted by the office of the governor, division of administration and the office of the information technology as provided for in LAC 4:XV.701 will be required. 7.The successful bidder shall be required to furnish a Performance and Payment Bond in an amount equal to one hundred percent (100%) of the Contract amount, which shall be written by a surety or insurance company currently on the U.S. Department of the Treasury Financial Management Service list of approved bonding companies which is published annually in the Federal Register, or by a Louisiana domiciled insurance company with at least an A- rating in the latest printing of the A.M. Bests Key Rating Guide to write individual bonds up to ten percent (10%) of policyholders surplus as shown in the A.M. Bests Key Rating Guide or by an insurance company in good standing licensed to write bid bonds which is either domiciled in Louisiana or owned by Louisiana residents, all in accordance with LSA R.S. 38:2219. 8.Bids shall be accepted only from contractors who are licensed under LSA R.S. 37:2150-2163 for the classification of Municipal and Public Works Construction. No bid may be withdrawn for a period of forty-five (45) days after receipt of bids, except under the provisions of LSA R.S. 38:2214. 9.The Owner reserves the right to reject any and all bids for just cause as permitted by LA R.S. 38:2214B. The ability of an entity to reject any bid is applicable only when administered in accordance with the Public Bid Law. In accordance with LSA R.S. 38:2212B.(1), the provisions and requirements of this Section, and those stated in the bidding documents shall not be waived by any entity. 10.The Owner shall incur no obligation to the Contractor/Bidder until the Contract between the Owner and the Contractor/Bidder is fully executed. 12.Official action on this bid will be taken within forty-five (45) days by the Calcasieu Parish Police Jury, as governing authority of Waterworks District No. Five of Wards Three and Eight, except as may be extended by mutual written consent with the lowest responsible bidder. 13.All bids must be plainly marked and should contain the following on the outside of the envelope: BID FOR HWY 397 and James Sudduth Road Waterline Loop and Replacement Project

Post-Bid

Water / Sewer

$277,000.00

Public - County

Site Work

25

9

2

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Special Procedures, Quality Requirements, Regulatory Requirements, References, Definitions, Reference Standards, Temporary Facilities and Controls, Construction Facilities, Temporary Construction, Vehicular Access and Parking, Temporary Roads, Traffic Control, Temporary Barriers and Enclosures, Temporary Barricades, Execution and Closeout Requirements, Examination and Preparation, Construction Layout, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Bonds, Warranties, Project Record Documents, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition, Site Remediation
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Joint Protection, Joint Sealants
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Exterior Specialties, Protective Covers, Canopies
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Pedestrian Control Equipment, Pedestrian Gates
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, Meters and Gages for Plumbing Piping, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Meters and Gages for HVAC Piping, General-Duty Valves for HVAC Piping, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Fine Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Embankments, Roadway Embankments, Erosion and Sedimentation Controls, Shoring and Underpinning, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Curbs and Gutters, Concrete Curbs and Gutters, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding, Plants, Trees, Planting Accessories
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection, Revetments
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Bulk Material Processing Equipment, Batching Equipment, Mixers
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
31
Active Projects
17
Bidding Soon
266
All Active Projects
117
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 7, 2023

April 6, 2023

img_map_placeholder

HWY 397 and James Sudduth Road, Lake Charles, LA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.