Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Sultan, Washington. Completed plans call for site work for a water / sewer project.
Fixed Cone Valve Installations Each bid shall be accompanied by Bid Security in the amount of five percent (5%) of the total amount Bid, excluding state and local sales tax. Work Description and Site: Provide all labor, equipment, tools, goods, materials, and incidentals necessary to replace a 48" Fixed Cone Valve (FCV), a 10" FCV and a 60 kW Hydroelectric turbine. These components are located inside the valve chamber at Culmback Dam, along with control panels in the Control Building at Culmback Dam. The District has procured the new valves and hydroelectric turbine/generator, and ancillary equipment, all of which are to be installed by this Contract. Everything else will be contractor-supplied in order to complete the project. There is no address available and is approximately 15 miles from the City of Sultan, WA 98294. The geodetic location is North 47 58' 31.37", West 121 41' 11.43". Questions about this solicitation shall be addressed to the contracts contact identified on the site for this Invitation to Bid The District intends to award a Contract on Tuesday, March 7, 2023, subject to change pursuant to the provisions of contained in the Bidding Documents for this Invitation to Bid. The District encourages qualified, Washington State certified Minority and Women's Business Enterprises to request these Bidding Documents and to bid on this work Bid Bond: 5% Performance Bond: 100% Payment Bond: 100% Maintenance Bond: 100% The Contractor shall achieve all interim milestones as set forth in the Contract Documents and Substantial Completion of the entire Work not later than 100 calendar days after the effective date of the District's written Notice to Proceed, subject to adjustments of this Contract Time as provided in the Contract Documents. The Contractor shall achieve Final Completion of the Work within 60 days of the date on which Substantial Completion is achieved. QA Deadline: February 14. 4PM, 2023
Award
Water / Sewer
$1,367,205.00
Public - County
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
24
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 21, 2023
March 13, 2023
Multiple Locations, Sultan, WA
Related To This Project
Sultan, WA
Bid Date: Apr 25 2019
Sultan, WA
Bid Date: May 11 2023
Sultan, WA
--
Sultan, WA
Bid Date: Sep 15 2022
Sultan, WA
Bid Date: Jul 20 2022
Sultan, WA
Bid Date: Sep 02 2022
Sultan, WA
Bid Date: May 02 2022
Sultan, WA
Bid Date: Mar 31 2022
Sultan, WA
Bid Date: Apr 22 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.