Site work for a water / sewer project in Sultan, Washington. Completed plans call for site work for a water / sewer project.

Fixed Cone Valve Installations Each bid shall be accompanied by Bid Security in the amount of five percent (5%) of the total amount Bid, excluding state and local sales tax. Work Description and Site: Provide all labor, equipment, tools, goods, materials, and incidentals necessary to replace a 48" Fixed Cone Valve (FCV), a 10" FCV and a 60 kW Hydroelectric turbine. These components are located inside the valve chamber at Culmback Dam, along with control panels in the Control Building at Culmback Dam. The District has procured the new valves and hydroelectric turbine/generator, and ancillary equipment, all of which are to be installed by this Contract. Everything else will be contractor-supplied in order to complete the project. There is no address available and is approximately 15 miles from the City of Sultan, WA 98294. The geodetic location is North 47 58' 31.37", West 121 41' 11.43". Questions about this solicitation shall be addressed to the contracts contact identified on the site for this Invitation to Bid The District intends to award a Contract on Tuesday, March 7, 2023, subject to change pursuant to the provisions of contained in the Bidding Documents for this Invitation to Bid. The District encourages qualified, Washington State certified Minority and Women's Business Enterprises to request these Bidding Documents and to bid on this work Bid Bond: 5% Performance Bond: 100% Payment Bond: 100% Maintenance Bond: 100% The Contractor shall achieve all interim milestones as set forth in the Contract Documents and Substantial Completion of the entire Work not later than 100 calendar days after the effective date of the District's written Notice to Proceed, subject to adjustments of this Contract Time as provided in the Contract Documents. The Contractor shall achieve Final Completion of the Work within 60 days of the date on which Substantial Completion is achieved. QA Deadline: February 14. 4PM, 2023

Award

Water / Sewer

$1,367,205.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

24

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
80
Active Projects
45
Bidding Soon
808
All Active Projects
304
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 21, 2023

March 13, 2023

img_map_placeholder

Multiple Locations, Sultan, WA

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.