BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and renovation of a water / sewer project in San Diego, California. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

The scope of work for the filter media rehabilitation consists of providing all necessary materials, tools, equipment, products, and labor to perform the filters underdrain repair, the rehabilitation of the filter media (anthracite, and gravel), media installation, and replenishment at NCWRP. At least one City officer or employee, in addition to the City employee opening the bids, will be present. Bid results will be announced to anyone attending the teleconference. Any person present on the teleconference shall have the right to ask for the announcements to be repeated or to ask that omitted data be supplied. Such requests will be honored to the extent they do not unreasonably delay or interfere with the bid opening process, as determined at the sole discretion of the City employee opening the bids. The Public Utilities Department, Wastewater Treatment and Disposal Division includes the North City Water Reclamation Plant (NCWRP), located at 4949 Eastgate Mall, San Diego, CA 91121. NCWRP is operated by the City of San Diego utilizing gravity filtration which is a mechanical process consisting of a concrete shell, filter media, a media support system, an underdrain, and a backwash system for regular cleaning of the media. Filtration at NCWRP is wastewater that has been oxidized, coagulated, and clarified, which is then passed through natural undisturbed filter media (anthracite coal) to remove particulate matter and meet title 22 equivalent standards. During the filtration process, the secondary clarifier effluent enters at the top of a filter and flows down through the filtering media (anthracite coal) exiting through the filter's underdrain system. The manufacturer of the underdrain system at NCWRP is F.B. Leopold. The backwash efficiency of filters at NCWRP has reduced over time due to underdrain issues, the anthracite coal (media) layer of the tertiary filters has partially washed away, and the formation of contaminants within the filter bed has created mudballs. The City is in the process of restoring the filters by repairing the underdrains and by adding media to reestablish the original design depth. Before new anthracite coal media is installed, the existing media must be rehabilitated by removing all contaminants present within the filter beds by using "in-bed" rehabilitation to return the existing media filter to near new condition. The facility has six (6) single cell bed filters. Five (5) filters contain media and one (1) is currently out of service and is empty. The filters are 53' X 21' and have a specific depth of 84" of anthracite coal and 18" of double reverse graded support gravel. Each filter holds 9460 Ft3 of filter material including the support gravel. The scope of work for the filter media rehabilitation consists of providing all necessary materials, tools, equipment, products, and labor to perform the filters underdrain repair, the rehabilitation of the filter media (anthracite, and gravel), media installation, and replenishment at NCWRP. Five percent (5%) discount off the bid price for SLBE or ELBE prime contractors; or b. Five percent (5%) discount off the bid price for prime contractors achieving the voluntary goal of twenty percent (20%) for SLBE or ELBE subcontractor participation set forth in Subsection B below. Question Deadline 03/14/2023 at 12:00 PM PT Online Q&A Yes

Bid Results

Water / Sewer

$2,222,420.00

Public - City

Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

53 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
350
Active Projects
175
Bidding Soon
2,235
All Active Projects
1,074
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

March 23, 2023

April 24, 2023

March 30, 2028

img_map_placeholder

4949 Eastgate Mall, San Diego, CA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.