Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published April 20, 2023 at 8:00 PM
Updated May 18, 2024
Site work for a water / sewer project in Burton, Michigan. Completed plans call for site work for a water / sewer project.
**As of April 20, 2022, D.V.M. Utilities, Inc. has been awarded the contract in the amount of $2,223,950.50. For SRF Wastewater Improvements - Segment 3 SRF Project Work under this Contract consists of the open cut replacement of approximately 733 feet of 8-inch to 12-inch sanitary sewer, the lining of approximately 29,887 feet of 8-inch to 21-inch sanitary sewer with cured-in-place pipe, and associated sanitary manhole rehabilitation. This project will be funded by a Clean Water State Revolving Fund Loan (CWSRF), all applicable rules and requirements will apply. Any questions regarding the project shall be brought to the attention of Spencer Cain, PE at Stantec Consulting Michigan Inc., in writing by email at spencer.cain@stantec.com. Questions by telephone call are prohibited. Questions will not be accepted if received less than nine (9) calendar days before the bids are due. All bids shall be submitted in a sealed envelope and shall contain, as a minimum, all of the following: Bidder's Qualification and Experience Statement (QES-1-4), Proposal (P1-5), Designation of Major Subcontractors and Suppliers (MS-1), Legal Status of Bidder (LS-1), Bid Certification (BC-1). Each Proposal shall be accompanied by a cashier's check, certified check, money order or bid bond, payable to the OWNER, in an amount not less than five percent (5%) of the amount of the Proposal, as a Bid Security. The Bid Security of the Bidders under consideration will be returned after approval of the Contract by the OWNER. All others will be returned after the Proposal opening. The successful Bidder will be required to furnish a satisfactory Performance Bond and Labor and Material Bond, each in the amount of One Hundred Percent (100%) of the Contract. Withdrawal of any Proposal is prohibited for a period of 90 days after the actual date of the opening thereof The OWNER reserves the right to accept any Proposal, to reject any or all Proposals, and to waive any irregularities in any Proposal, in the interest of the OWNER. The following requirements shall apply to the Contract for the work of this project and to all subcontracts thereunder: 1) State of Michigan Revolving Fund Requirements; 2) Project Wage Determination (under the Davis-Bacon Act, as amended, and related statutes); 3) Equal Opportunity Clause (Executive Order 11246); 4) Debarment Certification. The successful bidder shall fully comply with all of these special provisions and shall be responsible to ensure compliance with same by all of his subcontractors. Bids not incompliance with the contract requirement will risk forfeit of bid security bond. This project requires compliance with the Davis Bacon Act and adherence to the current U.S. Department of Labor Wage Decision. Document requests shall indicate whether request is by: Prospective Bidder, Prospective Subcontractor, Prospective Supplier, or other.
Award
Water / Sewer
$2,223,951.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Division 01 - General Requirements
Division 02 - Existing Conditions
Division 03 - Concrete
Division 04 - Masonry
Division 09 - Finishes
Division 11 - Equipment
Division 22 - Plumbing
Division 23 - Heating Ventilating and Air Conditioning
Division 26 - Electrical
Division 31 - Earthwork
Division 32 - Exterior Improvements
Division 33 - Utilities
Division 34 - Transportation
Division 41 - Material Processing and Handling Equipment
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment
Division 44 - Pollution Control Equipment
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 10, 2023
May 9, 2023

Multiple Locations, Burton, MI
Related To This Project
Burton, MI
Bid Date: Feb 23 2023
Burton, MI
Bid Date: Mar 01 2023
Burton, MI
Bid Date: Apr 10 2023
Burton, MI
Bid Date: Apr 14 2023
Burton, MI
Bid Date: Apr 06 2023
Burton, MI
Bid Date: May 05 2023
Burton, MI
Bid Date: May 19 2023
Burton, MI
Bid Date: May 25 2023
Burton, MI
Bid Date: May 10 2023
Burton, MI
Bid Date: Jan 31 2023
Burton, MI
Bid Date: Jan 31 2023
Burton, MI
Bid Date: Aug 10 2022
Burton, MI
Bid Date: Jun 06 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Find. Bid. Win. Your Next Project Starts Here.
ConstructConnect gives you the tools to search, analyze, and bid on verified commercial projects before your competition. Explore detailed project data, bidding timelines, and contact info—right when you need it.
Sign up now to get free company and project data instantly. No payment required.
.webp)
Upgrade now for industry‑leading commercial construction data.
You've reached the free-view limit.
Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.