Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 27, 2023 at 8:00 PM
Updated January 26, 2024
Site work for a water / sewer project in Jupiter Island, Florida. Completed plans call for site work for a water / sewer project.
The Town of Jupiter Island, Florida, (Town) is issuing an Invitation to Bid for Utility Production Well S-15 Demolition and Well S-15R Construction Services for South Martin Regional Utility (SMRU). The Project consists of the construction of Surficial Aquifer production Well S-15R and the demolition, plugging and abandonment of Surficial Aquifer production Well S15. The scope of work will include: removal of existing wellhead, concrete slab, electrical equipment/appurtenances, well pump, and fencing for the existing Well S15 and will include drilling, setting of casings and/or well screen, grouting, testing, well logging, video logging, pump testing, formation water disposal system (including temporary piping and pumps), well facility disinfection, fencing, clearing and restoration of well site, new pump and motor including column pipe and appurtenances, well head, piping, electrical instrumentation and controls, site work and site restoration of the proposed Well S-15R The Contractor shall furnish all necessary labor, materials, equipment and supplies, and shall execute and complete, to the satisfaction of the Town, and in accordance with the terms and conditions of the contract documents, all Project work described as provided in the construction drawings and technical specifications. Construction drawings and technical specifications: Prepared by Holtz Consulting Engineers, Inc., dated December 2022. The Invitation to Bid and construction drawings along with supporting specifications, addenda, etc. are available for by contacting the Jupiter Island Town Clerk, Kimberly Kogos, at 772-545-0100 or by email at kkogos@tji.martin.fl.us with a request for "ITB Package 2023-03; South Martin Regional Utility Production Well S-15 Demolition and S-15R Construction". Site: The Surficial Aquifer production Well S-15R Project site is located adjacent to the Eaglewood neighborhood. The site is accessed on the south side of Pierre Samuel du Pont Dr. approximately 1/4 mile west of SE Federal Hwy. The Contractor shall protect and restore all existing vegetation within the access path.
Bid Results
Water / Sewer
$1,292.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 10, 2023
April 10, 2023
To Be Determined, Jupiter Island, FL
Related To This Project
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
