BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 27, 2023 at 8:00 PM

Updated January 26, 2024

Site work for a water / sewer project in Jupiter Island, Florida. Completed plans call for site work for a water / sewer project.

The Town of Jupiter Island, Florida, (Town) is issuing an Invitation to Bid for Utility Production Well S-15 Demolition and Well S-15R Construction Services for South Martin Regional Utility (SMRU). The Project consists of the construction of Surficial Aquifer production Well S-15R and the demolition, plugging and abandonment of Surficial Aquifer production Well S15. The scope of work will include: removal of existing wellhead, concrete slab, electrical equipment/appurtenances, well pump, and fencing for the existing Well S15 and will include drilling, setting of casings and/or well screen, grouting, testing, well logging, video logging, pump testing, formation water disposal system (including temporary piping and pumps), well facility disinfection, fencing, clearing and restoration of well site, new pump and motor including column pipe and appurtenances, well head, piping, electrical instrumentation and controls, site work and site restoration of the proposed Well S-15R The Contractor shall furnish all necessary labor, materials, equipment and supplies, and shall execute and complete, to the satisfaction of the Town, and in accordance with the terms and conditions of the contract documents, all Project work described as provided in the construction drawings and technical specifications. Construction drawings and technical specifications: Prepared by Holtz Consulting Engineers, Inc., dated December 2022. The Invitation to Bid and construction drawings along with supporting specifications, addenda, etc. are available for by contacting the Jupiter Island Town Clerk, Kimberly Kogos, at 772-545-0100 or by email at kkogos@tji.martin.fl.us with a request for "ITB Package 2023-03; South Martin Regional Utility Production Well S-15 Demolition and S-15R Construction". Site: The Surficial Aquifer production Well S-15R Project site is located adjacent to the Eaglewood neighborhood. The site is accessed on the south side of Pierre Samuel du Pont Dr. approximately 1/4 mile west of SE Federal Hwy. The Contractor shall protect and restore all existing vegetation within the access path.

Bid Results

Water / Sewer

$1,292.00

Public - County

Site Work

32

18

5

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
37
Active Projects
1
Bidding Soon
745
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 10, 2023

April 10, 2023

Project location map

To Be Determined, Jupiter Island, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.