BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a mixed-use development in Golden, Colorado. Design plans call for site work for a playground / park / athletic field; and water / sewer project.

As of July 13, 2023, an engineer has been selected and this project is in the design phase. Although a firm timeline for construction has not been determined, construction is not expected to start prior to February 2024. *The closed solicitation has been included below for reference: The Colorado School of Mines (Mines) is seeking services of a qualified Design team to support the design and Contact Administration for upgrades to the existing track and field complex. Approximate construction cost is $1.8 million. Scope to include: Replace track surface and restripe with NCAA compliant lanes. Replace turf field and stripe for Football, soccer, men's/women's Lacrosse Move track jump pits from the West end to the North sidelines Move electronic control conduits that are cut with jump pit moves Move drainage system as required for modifications planned Runout lane for javelin throw area to be included in new track updates Possible Hammer throw move to allow for safety improvements Leveling the hammer throw grass area to be NCAA compliant Addition of a safety fence along West throwing areas Score board replacement with a digital board for multi-sport use This is a two-step process: Step 1 is review and evaluation of responsive submittals; Step 2 is shortlisted firms and interview evaluations. Buyer's Requirements General Requirements - Bidder Prequalification/Preregistration Required Question Acceptance Deadline 02/17/2023 05:00 PM EST Questions are submitted online No Job Location Golden, Colorado The minimum qualifications to submit for this RFQ are as follows: Performed minimum of 2 building projects for a State of Colorado institution of higher education with an emphasis on Athletics. Familiarity with the Mines campus and project site. Familiarity with NCAA rules and regulations for track and field design requirements. Ability to meet the design schedule to allow summer 2023 project completion. DO NOT PROVIDE A SUBMITTAL IF FIRM DOES NOT MEET THE ABOVE REQUIREMENTS. The method of Contractor Selection has not been Determined at this time.

Design

Playgrounds / Parks / Athletic Fields

$1,800,000.00

Public - State/Provincial

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
93
Active Projects
37
Bidding Soon
998
All Active Projects
419
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.