BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Greenville, South Carolina. Completed plans call for site work for a water / sewer project.

The following work shall be performed under this Contract: o Thoroughly clean all existing sewers in the Contract including complete silt, sand, root, grease and tuberculation removal and perform closed circuit television inspections (CCTV) of the sewers. The cleaning and CCTV requirement applies to sewers being lined with cured-in-place pipe lining. o For sewers being lined with CIPP, perform dye testing and/or flush testing to identify active service laterals connecting to the sewer as necessary and/or as directed by the Engineer. Identify active laterals by street address on the CCTV videos and logs. o Perform point repairs to the sewers as determined to be necessary by the Engineer during review of the Contractor's CCTV data. o Install CIPP in the existing sewers as specified on the Drawings and/or by the Engineer. o Rehabilitate active service laterals as specified by the Engineer via replacement or CIPP lining including installing cleanouts where directed. The Engineer will primarily determine defective laterals to be rehabilitated from review of the Contractor's CCTV information. o Rehabilitate existing manholes as specified on the Drawings and/or as directed by the Engineer. o Perform acceptance testing including post-rehabilitation CCTV inspectionsof the installed CIPP, CIPP and manhole rehab product testing, and vacuum testing of rehabilitated manholes. o Perform other miscellaneous work including complete restoration Please note: Funding through the State Revolving Fund (SRF) in South Carolina will be used to fund all or part of this project. As a result, the project will be subject to federal contracting requirements associated with the funding. In anticipation of these funds, ReWa will apply federal contracting requirements and will be responsible for oversight of these requirements. This project will also have Disadvantage Business Enterprise (DBE), Davis Bacon, American Iron and Steel and "Build America, Buy America (BABA)" requirements. Project Type Bid Response Types Line Items General Attachment Type of Award Lump Sum License Requirements WL Liquidated Damages $1000 per day Project Duration 395 days Bid Bond 5.00% Payment Bond 100.00% Performance Bond 100.00% Online Q&A Yes Q&A Deadline 02/27/2023 5:00 PM (EST)

Bid Results

Water / Sewer

$6,054,072.00

Public - County

Site Work

25

10

2

5

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
70
Active Projects
45
Bidding Soon
708
All Active Projects
309
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 8, 2023

April 7, 2023

img_map_placeholder

Multiple Locations, Greenville, SC


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.