BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 12, 2023 at 8:00 PM

Updated January 26, 2024

Site work for a water / sewer project in North Augusta, South Carolina. Completed plans call for site work for a water / sewer project.

The project area is immediately adjacent to the transition from concrete paving to asphalt paving east of the Sharon Jones Amphitheater and between the North Augusta Greeneway and the Savannah River. Construction shall be executed concurrently and consists of, but is not limited to: Part A shall consist of the construction of the plaza portion of the project. Part A shall include but not be limited to clearing, concrete installation, storm drainage, metal fence installation, bench construction, and landscaping. Part B shall consist of the procurement and installation of the piers, the floating dock, the gangway and all associated connections, appurtenances, and fixtures. Bids will be received for Single-Prime Contract on either part A or Part B or both. All proposals shall be unit price. Digital Electronic Copies of Complete plans, specifications, and contract documents (PDF format) will be available to bidding contractors via email or secured link from the Project Manager.

Bid Results

Water / Sewer

$157,998.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
35
Active Projects
4
Bidding Soon
511
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 12, 2023

June 13, 2023

Project location map

1001 Center St, North Augusta, SC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.