BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Bloomington, Illinois. Completed plans call for site work for a road / highway; and for paving for a road / highway.

There are no fees for the following Proposal Packets. Pre-qualification is required. 2023 MFT CONSTRUCTION SECTIONS McLean County 22-00045-05-RS Saybrook Rd (CH 36) Some Items Include: 2,240 Sq Yd - HMA Surf Rem 1.5"; 2,503 Ton - HMA BC IL-9.5FG N50; 5,223 Ton - HMA SC IL-9.5 Mix "C" N50; 3,926 Ton - Agg Wedge Shld Ty B; 200 Ft - SPBGR Ty A 6' Post; 250 Ft - SPBGR Ty A 9' Post; 75 Ft - LSGR Over Culv 12.5' Post; 344 Ton - CIR-FDR Foam Asphalt; 58,919 Sq Yd - CIP Recycle 4"; Other Misc Related Items McLean County 22-00046-16-RS Lake Spur Rd (CH 8) Some Item Include: 3,160 Cu Yd - Earth Exc (Wide); 18,958 Sq Yd - HMA BC Wide 4"; 49,700 Lbs - Bit Mat'l Tack Ct; 21,584 Ft - Long Jt Seal; 145 Sq Yd - Temp Ramp; 3,850 Ton - HMA BC IL-9.5FG N50; 6,100 Ton - HMA SC IL-9.5 Mix "C" N50; 350 Ton - Incident HMA Surf; 52,761 Sq Yd - HMA Surf Rem 2"; 100 Ton - Agg Wedge Shld Ty B; 41,520 Ft - Shld Rum Strip 8"; 42,580 Ft - Paint Pvmt Mark 5"; 273 Ea - Raise Refl Pvmt Mark; 3,138 Sq Yd - HMA Surf Rem VD; Other Misc Related Items There is no fee for the following Proposal Packet. Pre-qualification is required. 2023 Non-MFT CONSTRUC- TION SECTION McLean County 22-00039-04-SC Rock Rd (CH 40) Some Items Include: (Alt #1) - 76,889 Sq Yd - FDR; 138,400 Gal - CIR-FDR Emul Asphalt; 1,141 Ton - Cover Ct Agg CA-14; 1,060 Ton - Seal Ct Agg CA-15/16; 76,889 Sq Yd - Surf Prof Milling; Other Misc Related Items / (Alt #2) - 4,124 Ton - HMA Wedge; 10,990 Lbs - Bit Mat'l (Tack Ct); 6,662 Ton - HMA Surf Cse; 1,400 Ton - Agg Shld; Other Misc Related Items McLean County reserves the right to reject any and all proposals and to waive technicalities. All Bidders Authorization Forms MUST be completed & on file with the McLean County Highway Department prior to 12:00pm (noon), February 27, 2023. Jerry Stokes, County Engineer, McLean County, IL

Bid Results

Roads / Highways

$2,065,329.00

Public - County

Paving, Site Work

5

3

4

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
67
Active Projects
35
Bidding Soon
486
All Active Projects
227
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 28, 2023

March 30, 2023

img_map_placeholder

8th St, Bloomington, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.