BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 3, 2023 at 7:00 PM

Updated January 26, 2024

Site work and paving for a mixed-use development in Greenfield, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Project Category Code: Pavement - Marking, Roadway Lighting, Sidewalks/Curbs/Gutters, Electrical Installation/Construction, Sawcutting/Sidewalk/Pavement, ADA Curb Ramps, Traffic Control, Fire Hydrant, Landscaping, Landscaping - Seeding, Erosion Control - Temporary, Roadway Pavement Markings, Directional Drilling, Street/Roadway Reconstruction , Street/Road Pavement Marking, Conduit/Electrical/Telemetry, Sewer and Water Construction, Curbs, Paving (Highway, Road or Street) Description: The project consists of W. Waterford Avenue between S. 92nd St and S. 88th Street; also including S. 91st Pl, S. 91st St, S. 90th St, S. 89th St, and S. 88th St from W. Waterford Ave to termini. The project consists of approximately 3,300 linear feet of road reconstruction. Major work items and approximate quantities include: 9,600 cubic yards excavation common, 3,125 tons asphalt pavement, 10,050 tons base aggregate dense, 7,150 linear feet concrete curb & gutter, 2,230 square yards concrete driveway, 2,000 square feet of concrete sidewalk, 1,480 linear feet RCP storm sewer, 5,305 lineal feet electrical conduit, 1 each electrical cabinet, 4 each hydrant alterations, 17 street signs and posts, and 7,100 square yards lawn restoration. Bidders may not withdraw their bid within the 90-day period after the date of the bid opening. Please contact Kapur if you have any questions.

Bid Results

Roads / Highways

$1,879,245.00

Public - City

Paving, Site Work

60

11

2

6

Subscribe For Documents

37 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
111
Active Projects
4
Bidding Soon
2,353
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2023

March 31, 2023

Project location map

Multiple Locations, Greenfield, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.