Renovation of a water / sewer project in Friday Harbor, Washington. Working plans call for the renovation of a water / sewer project.

**As of May 19, 2023 project is on hold. No definite date for the rebid.** Town of Friday Harbor (Owner) is requesting Bids for the construction of the following Project: WWTP Improvements Project WE #2020-048. Bids received after the time fixed for opening will not be considered. All of the bid envelopes must be plainly marked on the outside, SEALED BID, FRIDAY HARBOR WWTP IMPROVEMENTS. The Project includes the following Work: Construction of several new improvements at the wastewater treatment plant (WWTP) within the existing active facility. New components include : Various new concrete basins and other structures; Conversion of the existing SBR basins into aeration basins; Improvements to the existing Blower Building; Improvements to the UV Disinfection Area, including a new Disinfection Building; 2W and 3W System improvements; Improvements to the existing Digester; Biosolids handling improvements; Miscellaneous system piping and vaults; A new Shop Building; and Various site improvements. Bids are requested for the following Contract: Town of Friday Harbor WWTP Improvements. Owner anticipates that the Projects total bid price will be approximately $19,000,000. The Project has an expected duration of 900 calendar days. Bidders that do not register will not be automatically notified of addenda and will need to periodically check the on-line plan room for addenda issued on this project. Bidding Documents may be downloaded from the designated website. Prospective Bidders are urged to register with the designated website as a plan holder, even if Bidding Documents are obtained from a website in either electronic or paper format. The designated website will be updated periodically with addenda, lists of registered plan holders, reports, and other information relevant to submitting a Bid for the Project. All official notifications, addenda, and other Bidding Documents will be offered only through the designated website. Neither Owner nor Engineer will be responsible for Bidding Documents, including addenda, if any, obtained from sources other than the designated website. Instructions to Bidders. For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents. It is anticipated that this project will be funded in part by the Washington State Department of Ecology and in part by USDA Rural Development CFDA Number 10.760. Neither the State of Washington nor any of its departments or employees are, or shall be, a party to any contract or any subcontract resulting from this solicitation for bids. American Iron and Steel : Section 746 of Title VII of the Consolidated Appropriations Act of 2017 (Division A Agriculture, Rural Development, Food and Drug Administration, and Related Agencies Appropriations Act, 2017) and subsequent statutes mandating domestic preference applies an American Iron and Steel requirement to this project. All iron and steel products used in this project must be produced in the United States. The term iron and steel products means the following products made primarily of iron or steel: lined or unlined pipes and fittings, manhole covers and other municipal castings, hydrants, tanks, flanges, pipe clamps and restraints, valves, structural steel, reinforced precast concrete, and Construction Materials. The following waivers apply to this Contract: De Minimus. Minor Components Pig Iron and direct reduced iron This Advertisement is issued by : Owner: Town of Friday Harbor The Town of Friday Harbor reserves the right to accept or reject any or all proposals and to waive informalities or irregularities. All bid proposals shall be accompanied by a bid proposal deposit in cash, certified check, cashiers check, or surety bond in an amount equal to five percent (5%) of Bidders maximum Bid price (determined by adding the base bid and all alternates). Should the successful bidder fail to enter into such contract and furnish satisfactory performance bond and payment bond both in an amount of 100 percent (100%) of the contract price within the time stated in the specifications, the bid proposal deposit shall be forfeited to the Town of Friday Harbor. All bidders and subcontractors shall have a contractors license to work in the State of Washington and a Town of Friday Harbor Business License. CFDA Number - 10.760

Final Planning

Water / Sewer

$33,348,422.00

Public - City

Renovation

319

41

77

3

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
231
Active Projects
106
Bidding Soon
3,223
All Active Projects
1,103
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

March 22, 2023

November 6, 2023

October 25, 2025

img_map_placeholder

375 Tucker Ave, Friday Harbor, WA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.