BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a playground / park / athletic field in Port Orange, Florida. Working plans call for site work for a playground / park / athletic field.

The City of Port Orange is soliciting sealed Proposals to acquire the services of certified companies to design and build a new themed playground, replacing the current City Center Playground. This project is funded, in part, with an ECHO (Environmental Cultural Historic Outdoor Recreation) Grant. A Bid Guarantee in the form of a Bid Bond executed by the Bidder and an acceptable surety or a certified check or bank draft payable to the City of Port Orange, Florida in an amount equal to five percent (5%) of the proposed price must be submitted with each proposal. If awarded, the Proposer must also be able to obtain both payment and performance bonds equal to one hundred percent (100%) of project value from a surety company licensed in Florida and must submit proof of their present bonding capacity with their submitted package in the form of a current (not older than 3 months) letter from bonding agent. Failure to include the bonding capacity letter with submittal may result in rejection of submittal. The work of this project consists of all demolition and disposal of the old playground equipment including grading ofthe site, survey, design, permitting, outside agency application and inspection fees (any City fees will be handled by thecontractor), labor, materials, equipment, tools, apparatus transportation, services, incidentals and all work necessaryto construct the new playground. The Port Orange City Center Sports Complex is located at 4625 City Center Dr., Port Orange, FL. The City desires to have the design of the equipment and layout be consistent with a sports theme. The playground equipment shall meet all the functional requirements as well as bring the latest in recreation design and philosophy to the layout. The selected firm will be required to post a Performance and Payment Bond for the Construction. All questions must be directed in writing to Chip Kent, Purchasing Agent, ckent@port-orange.org and purchdiv@portorange.org and reference "Questions on RFP #24-14 City Center Playground Replacement" in the subject line. Last day for questions will be August 16, 2024 at 5:00 PM EST

Final Planning

Playgrounds / Parks / Athletic Fields

$300,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
256
Active Projects
125
Bidding Soon
1,991
All Active Projects
796
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

October 18, 2024

November 18, 2024

img_map_placeholder

4625 City Center Dr, Port Orange, FL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.