BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a sidewalk / parking lot in Fort Collins, Colorado. Completed plans call for site work for a sidewalk / parking lot.

Question Acceptance Deadline: 02/22/2023 05:00 PM EST Questions are submitted online: No The Contract Documents provide for the construction of Bid 9750 Charger Installations - Electric Transit Buses. The Work The City of Fort Collins, on behalf of Transfort, is requesting proposals for installation of three (3) ABB 150kW Depot Charging Station each with three (3) Dispenser Boxes. Transfort has one maintenance and operational facility (TMF) located at 6750 Portner Road in Fort Collins. A garage addition was built in 2013 for bus storage - this is the location where the depot chargers will be installed. A project was completed over 2021-2022 to install a new transformer, distribution panel and electrical meter at this location to increase electrical capacity. As part of this project, three (3) depot charging stations were fully installed, each with three (3) dispenser boxes each; stub outs completed for an additional seven (7) charging stations to be installed. . Participation Requirements - Disadvantaged Business Enterprise (DBE) General Requirements - Bid Deposit Required - Contractors License Required - Federally Funded - Installation Required - Insurance Required - Prevailing Wage Required - Safety Standards Plan - Warranty Information Required Award Requirements - All or None Award Questions concerning the scope of the bid should be directed to Project Manager, Annabelle Phillips at aphillips@fcgov.com. Questions regarding bid submittal or process should be directed to Jake Rector, Senior Buyer at (970) 221-6776 or jrector@fcgov.com. All questions not addressed at the prebid must be submitted in writing via email to Annabelle Phillips at aphillips@fcgov.com, with a copy to Jake Rector at jrector@fcgov.com,

Award

Sidewalks / Parking Lot

$450,904.00

Public - City

Site Work

18

9

4

2

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
86
Active Projects
40
Bidding Soon
939
All Active Projects
396
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 9, 2023

April 10, 2023

img_map_placeholder

6570 Portner Rd, Fort Collins, CO

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.