BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 17, 2023 at 8:00 PM

Updated November 15, 2023

Site work for a civil project in Avon, Colorado. Completed plans call for site work for a water / sewer project; bridge / tunnel; and road / highway.

Question Acceptance Deadline 02/28/2023 02:00 PM EST Questions are submitted online Yes Furnish the labor, materials, equipment, and services to rehabilitate approximately 1700 LF of the Nottingham-Puder irrigation ditch by installing prefabricated HDPE liner (Intelliditch or equal) from the ditch headgate downstream to a culvert located east of the Eagle River Presbyterian Church on Nottingham Ranch Road. The project includes the installation of a new flume, removing vegetation, leveling the ditch flowline, and grading the ditch walls. Cut and fill material must be balanced as needed to grade a constant slope as shown on the engineering drawings.

Award

Water / Sewer

$744,134.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
52
Active Projects
27
Bidding Soon
365
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.