Site work and paving for a mixed-use development in McFarland, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The contracts available to bidders consist of the following: 2023 Street and Utility Improvements- Paulson Road: - 5,200 lineal feet new 30-inch curb & gutter - 1,700 lineal feet new 12-inch RCP storm sewer - 1,500 lineal feet new 8-inch ductile iron water main - 20 water service laterals - 200 lineal feet new 18-inch storm sewer - 450 tons 1.5-inch surface course asphalt paving - 530 tons 1.75-inch binder course asphalt paving - 13,000 square feet 5-foot wide concrete sidewalk 2023 Water Main Improvements- Spartan Drive to Taylor Road: - 1,500 lineal feet new 8-inch water main - 4 water service laterals - Bid options for excavated or trenchless water main installation - 600 lineal feet new 10-foot wide path - 13,000 square feet 5-foot wide concrete sidewalk The quantities and the main sizes are subject to change without notice prior to document distribution. The Contract Documents, consisting of Advertisement for Bids, Instructions to Bidders, Bidder's Proof of Responsibility, Affidavit of Qualifications, Bid Proposal Form, Affidavit of Organization and Authority, Bid Bond (in the amount of 5% of the maximum amount of the bid), Notice of Award Form, Agreement Form, Notice to Proceed Form, Performance/Payment Bond (100%), Certificate of Insurance, General Conditions, Supplementary Conditions, Technical Specifications, Drawings and Addenda (if any). QUALIFICATIONS: Bidders must be pre-qualified with the Village of McFarland for this work 5 days prior to the bid deadline in accordance with Section 66.0901 of the Wisconsin Statutes. Bidders must complete the Village's Affidavit of Qualifications and submit with the prequalification form. Each bidder must deposit, with his bid, security in the amount of 5% of the maximum bid amount. Bidders must be experienced in municipal pipeline construction. The Village of McFarland reserves the right to reject any and all bids and to waive informalities in any bid. Bidder agrees that the Work will be substantially completed, on or before September 15, 2023,Final completion on or before September 30, 2023.

Bid Results

Roads / Highways

$1,912,039.00

Public - City

Paving, Site Work

41

18

6

8

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
115
Active Projects
73
Bidding Soon
1,219
All Active Projects
485
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 23, 2023

March 27, 2023

img_map_placeholder

Paulson Rd, McFarland, WI

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.