BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Lincoln, Nebraska. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

GENERAL PROVISIONS AND REQUIREMENTS These Special Provisions amend orsupplement the City of Lincoln Standard Specificationsfor Municipal Construction, 2023 Edition and the City of Lincoln Supplemental Specifications and Standard Plans for Municipal Construction and other provisions of the Contract Documents asindicated herein. All provisionsthat are notso amended or supplemented via these special provisions remain in full force and effect. CONTRACT TIME, MILESTONES, AND LIQUIDATED DAMAGES The Contractor shall have a total of 105 calendar days to complete all work associated with this project. These days shall be divided up as follows. o 100 consecutive calendar days from the beginning of work date to achieve substantial completion ofthis project in 2023 o 5 consecutive calendar days to complete durable pavement markings in 2023 or 2024. All work along 48 th Street shall be substantially completed on or before October 31, 2023. Substantial Completion is defined as all Work complete and all lanes open to traffic, with the exception of durable pavement markings. The Contractor shall place Paint Markings if the Contractor is unable to place Durable Pavement Markings. Paint Markings placed in lieu of Durable Pavement Markings shall be maintained by the contractor until the point at which Durable Pavement Markings are placed. The warranty period forDurable Pavement Markings shall start at that point. Failure to meet the substantial completion date for work, completion ofseeding, or durable pavement markings shall result in liquidated damages to be assessed in accordance with the Lincoln Standard Specifications. CONSTRUCTION PHASING AND ACCESS The 48 th Street Rehabilitation Project shall be constructed as defined in these special provisions. The Contractor may close 48 th Street in segments until the Work is substantially completed; howeverlocal accessto businesses must be maintained. Closed segments may be asfollows: Old Cheney to BriarparkDrive and BriarparkDrive to Nebraska Parkway. Construction ofeach

Award

Roads / Highways

$1,111,839.00

Public - City

Paving, Site Work

10

5

2

2

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
50
Active Projects
32
Bidding Soon
495
All Active Projects
201
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 3, 2023

May 3, 2023

img_map_placeholder

S 48th St, Lincoln, NE

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.