BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Renovation of a mixed-use development in Turlock, California. Completed plans call for the renovation of a educational facility.

The Work includes modifications to the mechanical systems and controls of the campus Gymnasium/Fieldhouse building, as delineated on the project drawing set. Demolition includes decommissioning and removal of the existing dx and HHW air moving equipment, exhaust fans, and portions of ductwork. New work includes three new chilled/heating water air handlers, zone level terminal boxes with HHW reheat, exhaust fans, a new exterior mechanical yard, additions to the chilled water and heating water distribution, & all associated controls. The Trustees of the California State University will receive sealed bid proposals in the Corporation Yard Building, Room CY600L(Building 4 on Campus Map), at the above address, for furnishing all labor and materials for construction of the above-named Project, Project Number 23-413, for the California State University, Stanislaus The Trustees require the successful bidder to achieve three percent (3%) DVBE participation in contracting construction projects as established in the bidding documents, and bidders shall identify the DVBEs to be used to satisfy this requirement in their bids The engineer for the project is Nexus Engineering, 1400 Lone Palm Avenue Suite A, Modesto, CA 95351; Travis Haverman, Principal Engineer; telephone: 209-572-7399. Engineer's construction estimate is $2,000,000. Bid Bond BID BOND 10.00% PAYMENT BOND 100.00% PERFORMANCE BOND 100.00% Plans and specifications may be obtained after February 14, 2023 and after the required non-refundable payment of $160.00 per physical set or $75.00 per digital set has been made Direct All Technical Questions to: Eddie Magana, Facilities ChiefEngineer California State University, Stanislaus One University Circle Turlock, CA 95382 Ph: (209) 664-3218 or emaganal4@csustan.edu Completion- The time period for completion of the base bid of the project shall be 388 calendar days this project consists of the replacement of the existing hvac at the gymnasium building locker rooms & surrounding areas as shown on plans. modifications include removing the existing attic mounted fan/coil equipment, exhaust fans, and rooftop mounted equipment, and providing three new air handlers to feed the same areas, with modifications to the ductwork, heating water, and chilled water distribution as required. new controls shall connect to the campus existing automated logic (alc) system for monitoring and operation of the new hvac equipment. necessary modifications to existing structural and electrical systems shall be provided according to the drawings. note the following bid criteria: base bid - includes air handler ah-8 and all associated work. add alternate 1 - add air handler ah-7 and all associated work as noted on drawings. add alternate 2 - add air handler ah-6 and all associated work as noted on drawings. deduct alternate 1 - substitute chainlink for cmu enclosure at ah-8 as noted on drawings.

Post-Bid

Educational

$2,000,000.00

Public - State/Provincial

Renovation

22

19

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
135
Active Projects
70
Bidding Soon
1,338
All Active Projects
584
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 25, 2023

July 24, 2023

img_map_placeholder

1 University Cir, Turlock, CA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.