BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 7, 2023 at 8:00 PM

Updated January 26, 2024

Renovation of an educational facility in Orlando, Florida. Completed plans call for the renovation of a educational facility.

Major elements of the project include: 1. A comprehensive renovation project for Palmetto ES at 2015 Duskin Ave., Orlando, FL., 32839. Comprehensive renovation and remodeling of the entire campus to provide improved facilities meeting Orange County Public Schools' Design Guidelines and educational program requirements. The project scope includes all renovations needed to address current deficiencies and to upgrade all building and site facilities, systems, and finishes at or near the end of their useful life. The scope also provides for the remodeling of existing spaces to support current programs, life safety, and accessibility requirements. Construction will occur on an occupied campus. The scope will also include any temporary facilities and classrooms required to support construction phasing. Design/Pre-construction Services Commencement: July 2023 Construction Notice to Proceed: October 2024 Substantial Completion: July 2026 Question End Date 2/23/2023 2:00 PM Anticipated Award Date 4/25/2023 A comprehensive renovation project for Palmetto ES at 2015 Duskin Ave., Orlando, FL., 32839. Comprehensive renovation and remodeling of the entire campus to provide improved facilities meeting Orange County Public Schools Design Guidelines and educational program requirements. The project scope includes all renovations needed to address current deficiencies and to upgrade all building and site facilities, systems, and finishes at or near the end of their useful life. The scope also provides for the remodeling of existing spaces to support current programs, life safety, and accessibility requirements. Construction will occur on an occupied campus. The scope will also include any temporary facilities and classrooms required to support construction phasing. The estimated construction cost is $30,900,000. The OCPS MWBE participation goal for this project is 23%. The OCPS LDB participation goal for this project is 10%. The OCPS VBE goal is 3%.

Post-Bid

Educational

$30,900,000.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
353
Active Projects
193
Bidding Soon
2,474
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 8, 2023

October 1, 2024

Project location map

2015 Duskin Ave, Orlando, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.