BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 25, 2023 at 8:00 PM

Updated April 1, 2025

Site work and paving for a mixed-use development in National City, California. Completed plans call for site work for a road / highway; for paving for a road / highway; 63-space sidewalk / parking lot; sidewalk / parking lot; water / sewer project; playground / park / athletic field; and playground / park / athletic field.

This project includes construction of a new park improvement on the S-2 parcel and portions of the SP-1 and HP-1 (N) parcels at the Chula Vista Bayfront development site. The project includes construction of a 156-car AC paved parking lot along with two decomposed granite parking areas with an additional 63 spaces. In addition to the parking lots, site improvements include grading and earthwork, drainage improvements, site water, sewer, and electrical utilities and service connections to public utilities, an environmental fence, a dumpster enclosure, a growing grounds/maintenance shelter, Growing Grounds building, Restroom/Comfort Station building with sewer lift station, site electrical and lighting improvements, concrete and decomposed granite paved walkways and paths. Site furnishings and amenity improvements include play equipment and surfacing, benches, receptacles, concrete seawalls, bollards, bike racks and park signage. Landscape improvements include groundcover, shrub, and tree plantings to re-vegetate the majority of the park site. Compensatory mitigation planting to mitigate disturbance to sensitive biological resources within the park development footprint, and irrigation improvements in all planted landscape areas. Question Deadline 03/07/2023 at 2:00 PM PT All questions regarding these contract documents shall be directed to the Contracts Administrator Telephone: (619) 686-6247 Fax: (619) 686-6565 madams@portofsandiego.org Liquidated Damages $2,500 Per Calendar Day Estimated Bid Value $13,500,000.00 Start/Delivery Date May 2023 Project Duration 395 Calendar Day

Award

Sidewalks / Parking Lot

$12,543,730.00

Public - County

Paving, Site Work

441

67

2

6

Subscribe For Documents

93 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
198
Active Projects
83
Bidding Soon
1,217
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 22, 2023

May 1, 2023

Project location map

To Be Determined, National City, CA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.