BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a mixed-use development in Carbondale, Colorado. Completed plans call for the construction of a swimming pool; and for site work for a swimming pool.

The new Aquatics Center will consist of a bathhouse with locker rooms, showers and bathrooms, a pool mechanical room, and a control desk and administrative area for pool staff. Second-story multi-purpose flex space will be included in the design of the facility. The outside pool area will consist of a 4-lane, 25-meter lap pool, an entertainment pool with a diving and/or slide well, a therapy pool hot tub, a lawn play area, and a splash pad with a shade structure. This project will be partially funded through grants like GOCO, DOLA, etc. The project team will need to work with the owner to provide information as required by the grant processes. While we do not anticipate obtaining LEED or other certifications, this building will be designed for a high level of energy efficiency and sustainability in line with a LEED Gold or LEED Platinum facility to the extent budget allows. This Request for Proposal ("RFP") is issued to provide the selection process for Construction Manager at Risk (CMAR) services for the Carbondale Aquatics Center in Carbondale, Colorado. Firms submitting a response to the RFP will be asked at a minimum to state their understanding/experience of the project and offer their methodology for meeting the criteria noted in this RFP as well as complete the Scope & Fee Matrix attached. Interviews will follow the submission of proposals according to the schedule contained in the RFP. The John M Fleet Pool has served the Carbondale community for over 40 years. It is a place where kids learn to swim, teenagers pass the time in the summer, and community members engage in fitness activities. Located on a prime corner downtown, it acts as one of the community's entry points. While it has served Carbondale well, it is an aging facility that needs an update and redesign to meet Carbondale's needs today and into the future. The process is intended to identify opportunities for improvement in the aquatic facility. The planning effort documents the existing conditions of the pool and identifies areas where efficiencies could be realized. Through interviews with Town staff and key stakeholders, the process identifies constraints and opportunities for operations, programming, and the built perspectives. The process is informed by a working group comprised of representatives from pool user groups, town staff, and interested residents. The community was asked to provide feedback on the needs and desires of the Carbondale Pool, building off the engagement completed in 2019 by the Parks and Recreation Commission. This planning effort sought to provide efficient, fun, and inclusive ways for the community to participate in imagining what this facility could be going forward. The community's input offers the framework for the plan document, identifying the key infrastructure and amenities that should be included in an updated aquatics facility. There were discussions of "trade-offs" throughout the process to help the community understand the financial, operational, and physical constraints that need to be accounted for in the project. Two important aspects that were addressed regarding the aquatic facility plan were location and seasonality. Residents were asked their thoughts on these aspects in the survey. Their responses, combined with additional research information, were evaluated and discussed at length with the Working Group and other consulting groups. February 23, 2023 2:00 PM Deadline for receipt of questions and inquiries. Questions and inquiries regarding the RFP should be directed to Sarah Hoover (shoover@wemberinc.com) by the date aforementioned. The Client will issue a response to all questions by email. Questions should not be submitted to the Client, the Board, or other parties, doing so will cause this candidate's removal from the RFP process. The "Hard Cost" or construction budget for the project is approximately $6,000,000.00 and includes demolition, construction, general conditions, and overhead & profit. "Soft Costs" including design & engineering, permitting, FF&E, technology, contingency, 3rd party consultant service, etc.) will be in addition to the Hard Costs, and maintained by The Town of Carbondale. The Client reserves the right to accept or reject any or all responses to this RFP and to enter into discussions and/or negotiations with one or more qualified Proposing Firms, if such action is in the best interest of the Client. The Client has the right, in its sole and absolute discretion, to select the proposal or proposals that the Client determines best meets its needs. March 8 - March 10, 2023 Evaluation of Proposals and Notice of Short List March 13 - March 14, 2023 TBD Interviews of short-listed candidates March 24, 2023 Execute Agreement with selected CMAR

Post-Bid

Swimming Pools

$6,000,000.00

Public - City

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
42
Active Projects
25
Bidding Soon
314
All Active Projects
123
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

March 7, 2023

November 7, 2023

img_map_placeholder

684 Main St, Carbondale, CO

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.