Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a mixed-use development in Independence, Missouri. Completed plans call for the renovation of a educational facility.
Replacement of Interior and Exterior Doors- . Independence School District (the "District") seeks a contractor ("Contractor") to perform Replacement of Interior & Exterior Doors for District Buildings ASSA ABLOY Hardware can be used as an alternate. Locations-School Buildings Sugar Creek Elementary School 11424 Gill Street, Independence, MO 64054 Sunshine Center 18400 E. Salisbury Road, Independence, MO 64056 William Chrisman High School; 1223 N. Noland Road Independence, Missouri 64050 The deadline for questions is Friday, February 17, 2023 at 2:00 PM (CST) ISP Interior and Exterior Door Replacement Carpentry Related Work for the ISD - Sugar Creek Elementary, Sunshine Center, William Chrisman High School We will accept ASSA ABLOY Hardware as an alternate Sugar Creek Elementary - Furnish and installation of 1 hollow metal frame o Furnish and installation of 4 FRP doors flush in existing frames o Furnish and installation of 8 full glass aluminum doors in existing frames o Furnish and installation of 60 prefinished wood doors o Furnish and installation of finish hardware at above o Removal of existing as necessary for installation of above along with haul off Sunshine Center - Furnish and installation of 1 hollow metal frames o Furnish and installation of 1 aluminum frame o Furnish and installation of 5 FRP Doors o Furnish and installation of 91 prefinished wood doors o Furnish and installation of 4 bifold doors (1'6" leaves) o Furnish and installation of 17 wood transoms o Furnish and installation of finish hardware at above o Installation of 59 existing locksets o Installation of 2 owner provided locksets o Furnish and installation of blocking in ceiling for accordion partition o Furnish and installation of accordion partition (Modernfold 29'3"xll'2") with vinyl fabric. o Removal of existing as necessary for installation of above along with haul off William Chrisman High School- Furnish and installation of 30 hollow metal frames o Furnish and installation of 1 aluminum frame o Furnish and installation of 6 FRP doors o Furnish and installation of 248 wood doors o Furnish and installation of finish hardware at above o Furnish and installation of 1 sectional door and track (Note: No operator or glass figured with this opening.) o Furnish and installation of transom glass at 1 opening o Removal of existing as necessary for installation of above along with haul off
Post-Bid
Educational
$200,000.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 28, 2023
June 1, 2023
Multiple Locations, Independence, MO
Related To This Project
Independence, MO
Bid Date: Feb 28 2023
Independence, MO
--
Independence, MO
--
Independence, MO
Bid Date: Mar 06 2023
Independence, MO
--
Independence, MO
Bid Date: Mar 16 2023
Independence, MO
Bid Date: Mar 07 2023
Independence, MO
Bid Date: Mar 17 2023
Independence, MO
Bid Date: Feb 28 2023
Independence, MO
Bid Date: Feb 28 2023
Independence, MO
Bid Date: Feb 28 2023
Independence, MO
--
Independence, MO
Bid Date: Feb 23 2023
Independence, MO
Bid Date: Mar 08 2023
Independence, MO
Bid Date: Feb 17 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.