Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 9, 2023 at 7:00 PM
Updated February 15, 2024
Site work and paving for a mixed-use development in Fairmount, North Dakota. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
Online Bidding: Available Kyle Rieth, telephone: 701.282.4692, kyle.rieth@mooreengineeringinc.com, Only questions made in writing by an attachment (PDF) to email or mail may be considered for response by Addenda. Description: Bids will be received for the following prime Contracts: Contract A: Sanitary Sewer Improvements - 3rd Street from 3rd Avenue North to 2nd Avenue South: sanitary sewer improvements including sanitary sewer main and service replacements, sanitary main relining, sanitary sewer manhole rehabilitation, incidental asphalt patching, and miscellaneous construction items as shown in the Drawings and associated specification sections. Contract B: Storm and Street Improvements - Front Street from Main Avenue to 4th Avenue South: storm and street improvements including installation of storm sewer pipes and structures, sanitary sewer spot repair, replacement of curb and gutter, concrete flatwork, asphalt milling, asphalt patching and overlay, and miscellaneous construction items as shown in the Drawings and associated specification sections. Contract C: Asphalt Emulsion Seal Coat: seal coat improvements throughout the entire City of Fairmount as shown in the Drawings and associated specification sections. Additional Description: Contract A : $420,000.00 Contract B: $510,000.00 Alternate B1: $10,000.00 Contract C: $265,000.00 Bid Result Contract A - Sanitary Sewer Improvements on 3rd Street from 3rd Avenue North to 2nd Avenue South - Crow River Construction - $495,225.00 Contract B - Storm and Street Improvements on Front Street South from Main Avenue to 4th Avenue South - Crow River Construction - $630,839.50 Alternate B1 - Perforated Pipe - Crow River Construction - $3,490.00 Contract C - Asphalt Emulsion Seal Coat - Crow River Construction - $325,000.00
Bid Results
Water / Sewer
$1,454,555.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 8, 2023
May 8, 2023
Multiple Locations, Fairmount, ND
Related To This Project
Fairmount, ND
Bid Date: Apr 11 2023
Fairmount, ND
Bid Date: Feb 11 2022
Fairmount, ND
Bid Date: Nov 15 2024
Fairmount, ND
Bid Date: Nov 06 2025
Fairmount, ND
Bid Date: Nov 18 2022
Frontier, ND
Bid Date: Apr 19 2023
Bismarck, ND
Bid Date: Mar 08 2023
Grand Forks, ND
Bid Date: Mar 09 2023
Killdeer, ND
Bid Date: Feb 15 2023
Manning, ND
Bid Date: Feb 15 2023
Fargo, ND
Bid Date: Mar 01 2023
Fargo, ND
Bid Date: Mar 06 2023
Bowman, ND
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
