Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
This is a service / maintenance or supply contract in Stuart, Florida. Contact the soliciting agency for additional information.
Landscaping Installation and Maintenance Services Sub Service Description: Lawn Maintenance. Q/A Cutoff Date: 03/15/2023 Q/A Cutoff Time: 02:00 PM EDT Estimated Budget: $60,000.00-$70,000.00 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Provide lawn care service for various developments of The Housing Authority of the City of Stuart, Florida Rhonda Corrodus, Procurement Specialist 772-429-6435 (office); 772-466-0663 (FAX) rhonda.corrodus@cfpha.org The work shall be done using good lawn care practices and in accordance with all applicable Local, State, and Federal codes and regulations. Failure to provide requested information might result in proposal disqualification. 2. The Contractor must submit a breakdown which details staffing (number of staff and how many years each staff person has been in lawn care), equipment type and quantity, company's number of years in services, three (3) references minimum, not to include the SHA, with the bid package. 3. It is the responsibility of the Contractor to arrange an inspection of the property with the manager prior to submitting this proposal to verify each site, identify boundaries and existing conditions prior to submitting a bid. It is highly recommended that inspections occur before the Pre-Proposal Meeting. 4. The Contractor will repair and replace any items damaged by the work in progress, matching existing materials at no additional cost to the Owner. This also includes personal property of a resident. 5. The Contractor must provide a schedule of work on the first of each month to the Director of Housing Programs and Property Manager showing a schedule of work for that month. The Contractor will notify the SHA (1) working day in advance before any work begins. Failure to notify a SHA will result in an unsatisfactory inspection report. If there are any deviations, changes or weather delays, the manager of the property affected will be called by 8:30 a.m. and notified of the change. Payment for work performed without a schedule will not be permitted. 6. Appearance will be the governing factor at all times. At completion of service at each Community, the SHA and Contractor will inspect the complex grounds for acceptability. A minimum of a satisfactory must be obtained in order to receive payment. 7. The Contractor shall maintain their own inventory of required tools and equipment to perform all requested duties. 8. The SHA as Owner reserves the right to determine if a site needs to be serviced. Services for a particular month may be delayed and re-scheduled to another month based on the needs of the community. 9. All bodies of water, retention, detention, ditches, bank edges, etc. should follow all lawn care maintenance practices for mowing, edging, etc. Vegetation within bodies of water must be cut and removed at the discretion of the SHA or Maintenance Supervisor. 10. Under some circumstances, the SHA may request partial services. The balance of the service may be requested at a later date based on the needs of the SHA. 11. The Contractor must provide a cost breakdown for lawn maintenance of each community. 2. The schedule of work is intended to minimize the disruption of daily operations at various developments. 13. Lawn Areas a. All lawn areas shall be cleared of litter and debris such as paper, plastic containers, cans, glass containers, and tree debris before mowing. Debris will be removed from lawn at least once a week during non-mowing season. Due to severe weather conditions, limbs and other tree debris will be removed starting on the next workday. The Contractor shall dispose of litter and debris collected off-site. b. All personal items on lawn areas shall be picked up prior to cutting grass and turned over to SHA officials. c. All turf grass shall be cut each cycle no lower than two (2) inches. d. Edge all perimeter lawn areas adjacent to paved surfaces or structural edges such as sidewalks, walkways, driveways, parking lots, curbing, headers and retaining walls with a gas operated edger with metal blades. e. Trim all lawn areas around trees, bed edges, fences, posts, walls, buildings, irrigation heads, sidewalks and porches, clothesline poles, fences, garbage can holders, power poles, shrubbery, trees, and other obstacles where mowers and edger cannot be used. Special care shall be taken to prevent unnecessary injury or damage to any plant material such as flowers, small tree trunks or shrubs. f. Clean all clippings and trimmings from mowing, edging and trimming by sweeping vacuuming, and/or machine blowing walkways, drives, parking lots, curb steps, decks, courts and other paved areas. Also clean all clippings and trimming from lawn areas by end of workday
Post-Bid
Residential Subdivision
$70,000.00
Public - City
Service, Maintenance and Supply
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 30, 2023
May 1, 2023
611 SE Church St, Stuart, FL
Related To This Project
Stuart, FL
Bid Date: Mar 22 2023
Stuart, FL
Bid Date: Mar 29 2023
Stuart, FL
Bid Date: Mar 22 2023
Stuart, FL
Bid Date: Jun 05 2024
Stuart, FL
Bid Date: Aug 13 2024
Stuart, FL
Bid Date: Apr 05 2023
Stuart, FL
Bid Date: Mar 29 2023
Stuart, FL
Bid Date: Feb 28 2023
Stuart, FL
Bid Date: Mar 01 2023
Stuart, FL
Bid Date: Feb 07 2023
Stuart, FL
Bid Date: Mar 01 2023
Stuart, FL
Bid Date: Dec 09 2020
Stuart, FL
Bid Date: Apr 01 2020
Stuart, FL
Bid Date: Sep 01 2021
Stuart, FL
Bid Date: Jun 30 2021
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.