BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving and new construction of a mixed-use development in Morton, Illinois. Design plans call for site work for a road / highway; for paving for a road / highway; bridge / tunnel; for the construction of a bridge / tunnel; for the demolition of a bridge / tunnel; bridge / tunnel; and water / sewer project.

As of December 26, 2023, a design team has been selected. Construction timeline has not been identified. Job No. P-98-023-23, Various Phase I/II Projects, Bridge Bundle, Various Routes, Various Counties, Region Five/District Eight. This project requires 22% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. The Complexity Factor for this project is 0. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on May 3, 2023, at 1:00 PM at the Region Five/District Eight Office in Collinsville. Phase I and II services are needed for the replacement of multiple structures. These projects are anticipated to be let as a group for construction and consideration should be made for this during the plan development process. Phase I engineering services may include, but are not limited to, data collection, Bridge Condition Reports, Hydraulic Reports, Structure Reports, Structure Geotechnical Reports, Type, Size and Location Plans, Location Drainage Studies, ground and hydraulic surveys, cost estimates, right of way information, preparation of environmental documentation for submittal by District, environmental consequences, and related work necessary to produce Project Reports for bridge or roadway projects. Phase II work may include preparation of pre-final and final construction plans for these structure replacement projects. Projects or tasks requiring CADD are anticipated to be completed using 3D modeling utilizing Bentley's Open Roads Designer software (or equivalent) and our current CADD environment in accordance with the latest IDOT Computer Aided Design, Drafting, Modeling and Deliverables (CADD) Manual. The department will furnish the Consultant with any existing structure and roadway plans, structure inspection reports, agency coordination, existing right-of-way plans, existing and projected traffic data, utility coordination, crash data, and other relevant and available information as necessary. The estimated engineering fee for this project is $1,000,000. The completion date for this contract will be 60 months after authorization to proceed. The Prime firm must be prequalified in the following categories to be considered for this project: Highways (Roads and Streets) Location Design Studies (Rehabilitation) Structures (Highway: Typical) Statements of Interest, including resumes of only the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The method of contractor selection has not been determined at this time. IDOT - 41 - RFQ Engineering - Various Phase I/II Projects, Bridge Bundle, Various Routes, Various Counties, Region Five/District Eight

Design

Bridges / Tunnels

$5,000,000.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
71
Active Projects
47
Bidding Soon
589
All Active Projects
296
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 23, 2024

img_map_placeholder

Multiple Locations, Morton, IL

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.