Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a mixed-use development in Granite City, Illinois. Design plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
As of December 26, 2023, a design team has been selected. Construction timeline has not been identified. Job No. P-98-049-22/D-98-078-22, IL Route 3 from New Poag Road to Northgate Industrial Drive, Phase I/II Project, Madison County, Region Five/District Eight. This project requires 23% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. The Complexity Factor for this project is 0.035. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on April 27, 2023, at 1:30 PM at the Region Five/District Eight Office in Collinsville. Phase I engineering services are required for all work associated with the preparation of preliminary engineering and environmental studies for IL Route 3 from New Poag Road to Northgate Industrial Drive in Madison County. Currently, IL Route 3 has been identified for pavement replacement in accordance with the Department's Transportation Asset Management Plan (TAMP). The proposed improvement is to replace the existing pavement while staying within the footprint of the existing roadway, where possible. This improvement may involve drainage, ADA, and minor intersection improvements. Public involvement will be required, as well as environmental studies. This work will involve all work necessary for the preparation of the Project Report, including but not limited to, environmental studies and coordination, Location Drainage Study, geometric studies, public involvement using Context Sensitive Solutions, Intersection Design Studies (IDS), traffic management plan, and all other work necessary to complete Phase I and obtain Design Approval. Phase II engineering services required for this project are anticipated to include the preparation of all Plans, Specifications and Estimates (PS&E documents). This includes roadway and structure plans, maintenance of traffic plans, sign truss repair/replacement plans, drainage plans, storm water pollution prevention plan, erosion control plans, roadway lighting plans, and traffic signal plans. Additional items include, but are not limited to, supplemental surveys, geotechnical boings/cores and analysis, detailed traffic management plans and all other necessary related work to complete Phase II for final PSE. The department will furnish the consultant with any existing structure and roadway plans; topographic survey, agency coordination; existing right-of-way plans; crash data; traffic data, and utility coordination. The estimated construction cost for this contract is $38,500,000. This contract must be completed by June 30, 2026. The Prime firm must be prequalified in the following categories to be considered for this project: Highways (Roads and Streets) Location Design Studies (Reconstruction/Major Rehabilitation) Statements of Interest, including resumes of only the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The method of contractor selection has not been determined at this time. IDOT - 45 - RFQ Engineering - IL Route 3 from New Poag Road to Northgate Industrial Drive, Phase I/II Project, Madison County, Region Five/District Eight
Design
Roads / Highways
$38,500,000.00
Public - State/Provincial
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 23, 2024
IL-3, Granite City, IL
Related To This Project
Granite City, IL
Bid Date: Feb 28 2023
Granite City, IL
Bid Date: Feb 28 2023
Granite City, IL
--
Granite City, IL
Bid Date: Mar 03 2023
Granite City, IL
Bid Date: Nov 17 2023
Granite City, IL
Bid Date: Nov 29 2021
Granite City, IL
Bid Date: May 04 2023
Granite City, IL
Bid Date: Apr 28 2023
Granite City, IL
Bid Date: Mar 03 2023
Granite City, IL
Bid Date: Feb 20 2023
Granite City, IL
Bid Date: Feb 02 2023
Granite City, IL
Bid Date: Feb 14 2023
Granite City, IL
Bid Date: Feb 07 2023
Granite City, IL
Bid Date: Feb 07 2023
Granite City, IL
Bid Date: Feb 07 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.