BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 4, 2023 at 7:00 PM

Updated January 26, 2024

Site work and paving for a civil project in Ottawa, Wisconsin. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; and road / highway.

A Bidder's qualification statement must be delivered to Town of Ottawa at least 5 days before the Bid opening date. Bids shall be accompanied by a Bond or Certified Check payable to Town of Ottawa equal to 5 percent of the Bid. If the successful Bidder fails to execute the Contract and furnish payment and performance bonds within 15 days after the award, the Check or Bid Bond may be forfeited to Town of Ottawa as liquidated damages. Pre-Bid Meeting Info: No Pre-Bid Meeting. Partial sets of Bidding Documents are not available. Neither Owner, Engineer nor Issuing Office is responsible for full or partial sets of Bidding Documents, including any Addenda, obtained from other sources. The cost of Bidding Documents is non-refundable. Each entity obtaining Bidding Documents from the Issuing Office will be designated as a Plan Holder of Record. Bids received from entities who are not Plan Holders of Record may be returned as being nonresponsive. Project Category Code: Aggregate, Bituminous Patching/Coating/Surfacing, Crack Sealing Repair and/or Maintenance, Street/Road Asphalt Resurfacing and Milling, Paving (Highway, Road or Street), Sawcutting/Sidewalk/Pavement, Street/Road Asphalt Milling, Traffic Control, Pavement Removal, Pavement Resurface and Rehabilitation, Asphalt Pulverizing, Paving (Asphalt or Concrete) Description: Project involves 1,900 tons of asphaltic pavement, 8,500 S.Y. pulverization and 6,800 L.F. limestone shoulder on various Town roads, remove and replace of 15-inch CMP culvert. Mandatory Alternates include 400 S.Y. asphaltic patch, 200 S.Y. flex patch, crackfilling, and 12,200 S.Y. microsurfacing of various tow roadways. Additional Description: All Work is included in a single prime contract. Bidding Documents, including Drawings and Specifications, may be examined at the offices of Town of Ottawa and the Consulting Engineer during regular business hours. Construction time is of the essence. Completion delays are subject to liquidated damages. The Town of Ottawa reserves the right to accept the most advantageous Bid, or to reject any and all Bids. Award of Work described herein is subject to the provisions of the Wisconsin Statutes.

Bid Results

Roads / Highways

$317,889.00

Public - City

Paving, Site Work

3

15

2

3

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
571
Active Projects
304
Bidding Soon
2,677
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2023

March 31, 2023

Project location map

Multiple Locations, Ottawa, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.