BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a municipal facility in Douglasville, Georgia. Working plans call for the construction of a 8,000-square-foot municipal facility; and for site work for a municipal facility.

Project No. DDS-21, GA8501000AE, DDS-017-DP New Customer Service Center, Bogart, Oconee County, Georgia c. Deadline for finalist submission of written questions and requests for clarification 3/29/23 2:00 PM GA LSF NO.: 001310 The Georgia State Financing and Investment Commission (GSFIC), as "Owner", on behalf of the Georgia Department of Driver Services ("Using Agency"), is seeking firms interested in providing Design-Build Services for a project known New Customer Service Center, Bogart, Oconee County, Georgia. The Request for Qualifications (RFQ) document can be downloaded by selecting the Document tab at the top of this page. Interested firms should continue to check this site for project related updates. It is envisioned that this new center will be an approximately 8,000 sq.ft. facility with 10 to 12 issuance stations. The facility will have adequate space for queuing customer, and dedicated areas for 9 customer kiosk and 20 testing computers. The testing area will be designed in a way that will prevent noise from interfering with customers. It is also envisioned that there will be adequate space near the customer exit door for a self-service kiosk. The administrative portion of the building should be able to accommodate 3 offices, a supply closet, and other ancillary support space as needed. In addition to the building the site must be designed in a manner as to provide space for two basic skills test courses and one motorcycle test course that must be separated from the main parking lot with limited access. These test areas should be easily accessible from a covered area connected to the building for conducting car inspection prior to them entering the testing areas. The dimension for the basic skills test course is 50x100 and the motorcycle test course is 75x115. The testing areas must be designed to give testers the ability to enter/exit the testing area and maneuver around the course without difficulty. There will need to be dedicated employee parking with a minimum of 18 parking spaces and a minimum of 60 customer parking spaces. Confirmed shortlist

Final Planning

Municipal

$3,550,000.00

Public - State/Provincial

New Construction, Site Work

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
284
Active Projects
148
Bidding Soon
2,123
All Active Projects
1,020
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

April 18, 2023

June 19, 2023

February 14, 2024

img_map_placeholder

8470 Earl D Lee Blvd, Douglasville, GA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.