EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 12, 2023 at 8:00 PM

Updated October 1, 2024

Site work and paving for a mixed-use development in Lombard, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The proposed work is officially known as "DOWNTOWN SIDEWALK IMPORVEMENTS". The scope of the work includes sidewalk removal, earth excavation, sidewalk construction, concrete curb & gutter removal and replacement, driveway reconstruction, storm sewer construction, adjustment of drainage structures, parkway restoration, and other incidental and miscellaneous items of work in accordance with the Plans, Standard Specifications, and these Special Provisions. Project Category Code: Pedestrian Improvements, Sidewalks/Curbs/Gutters, ADA Curb Ramps Pre-Qualification: Yes Site Directions: St Charles Road between Elizabeth Street and Craig Place. Any question(s) must be submitted to Mr. Michael Spolar at spolarm@villageoflombard.org by no later than March 1, 2023 at 3:00 PM. Questions submitted after the deadline shall not be acknowledged. Bids will not be accepted from any prospective bidder who has not purchased contract documents through online. The proposed improvement is located along St Charles Road between Elizabeth Street and Craig Place in the Village of Lombard, DuPage County, Illinois Section , Township 39N, Range 11E. The center of the project is at 41d53m14.23s North and 88d01m05.88s West . The project consists of replaceing existing brick paver sidewalks with portland cement concrete sidewalk with a decorative edge. The work also includes storm sewers, ADA improvements, pavement markings, and pedestrian improvements.

Award

Sidewalks / Parking Lot

$2,864,780.00

Public - City

Paving, Site Work

4

7

50

4

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Temporary Construction, Temporary Ramps, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Execution
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Air Distribution, HVAC Ducts and Casings
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Backfill, Compaction, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Watering, Bases, Ballasts, and Paving, Unit Paving, Planting, Turf and Grasses, Plugging, Sodding, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Utility Structures
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
213
Active Projects
129
Bidding Soon
2,333
All Active Projects
1,040
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 8, 2023

April 15, 2023

img_map_placeholder

St Charles Rd, Lombard, IL


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Downtown Sidewalk Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.