BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a sidewalk / parking lot in Santa Monica, California. Completed plans call for site work for a sidewalk / parking lot.

For questions on Prevailing Wage in the City of Santa Monica, please contact Lizette Rodriguez at 310 458­ 8721 ext. 2341, lizette.rodriguez@smgov.net. provide replacement of damaged bus stop amenities within the City of Santa Monica. Bus stops in Santa Monica are a custom developed, manufactured, and installed amenity, requiring site-specific replacement knowledge. These stops were part of a 7-year development project completed in 2015. Due to the nature of these custom amenities, specific site construction plans, installation procedures, and the need for preapproved traffic plans, bidders need specific understanding and knowledge of each location needing repairs or replacement. These types of stop amenities are supported by an encasement of concrete below surface grade, are installed using a crane and require concrete demolition and re-pouring of sidewalk to complete replacement. In the course of replacing these bus stop amenities, bidders may be required to perform the following duties: Submit temporary traffic control plans as required and obtain approval from the City of Santa Monica Use existing as-built drawings for verification of all underground utilities Work with dig-alert as required for verifying underground utilities Install plywood barricade during all phases of construction Post all safety related signage to alert the public to construction Post all necessary temporary bus stop closure and movement signage during construction - Saw-cut sidewalk according to existing as-built drawings - Remove damaged amenity units with crane and haul away as necessary - Replace custom units as per approved existing blueprints - Re-pour sidewalk with existing concrete type, ensuring that original type of concrete or paver is put in place per original blueprint - Re-install pavers and fix depression in pavers that could pose a trip hazard - Install Big Blue Buss logo signage sticker at top of replacement unit - Install window acrylic panels - Remove and dispose of barricades and clean bus stop area - Work with City inspectors and SMDOT management for verification and sign-off of proper installation procedures Payment Bond Only the successful bidder will be required to submit a payment bond, because the good or service exceeds $25,000. Questions must be submitted online in the tab. The City will only accept or respond to questions submitted through the online vendor portal. Questions regarding this bid are due Tuesday, February 21, 2023 no later than 3:00 pm Pacific Time Bidders must possess a valid C-20-X-1-2022-1 and SC-23-102-2-2022-1 California contractor's license at the time the bid is submitted or be otherwise deemed qualified to perform the work specified. Bids submitted using the license name and number of a subcontractor or other person who is not a principal partner or owner of the company making this bid, will be rejected as being non-responsive.

Award

Sidewalks / Parking Lot

$6,490.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

8

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
189
Active Projects
96
Bidding Soon
2,148
All Active Projects
948
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 2, 2023

April 3, 2023

img_map_placeholder

To Be Determined, Santa Monica, CA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.