BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in Lansing, Michigan. Design plans call for the renovation of a municipal facility.

As of June 22, 2023, information regarding the award and award date has not been disclosed. A firm timeline for construction has not been established. *The closed solicitation has been included below for reference: Please do not submit online questions via SIGMA VSS. ALL questions should be emailed to Joel Gordon at gordonj1@michigan.gov no later than 12:00 p.m., Eastern on Friday, March 3, 2023. Exterior repairs, waterproofing and cleaning of the entire MLHC facility. The findings in a 2012 Exterior Infrastructure Study illustrate waterproofing on the building is no longer providing adequate protection. There are areas that require repairs or replacement at the limestone panels, granite systems, copper walls, plaza pavers, loading docks and levelers, storefronts, entryways, windows, and concrete approaches due to years of water infiltration. The PSC shall determine if a snowmelt system would prove to be beneficial in the courtyard areas. These repairs shall be made prior to caulking and cleaning of the areas. Beyond the façade, many of the docks, entryways and railings need repairs or full replacements due to water infiltration and corrosion caused by winter salting. They include but are not limited to, the main storefronts, terraces, and dock doors. Also, the south side stormwater concrete crock and hatch system has deteriorated and is starting to cave in and needs repairs Replacement of the atrium windows. The current windows, seals and aluminum frames have begun to fail and need to be replaced. Failed gaskets have caused water to infiltrate the building, damaging the structure and creating an environment for mold growth. There are many artifacts and library material that could be destroyed should a catastrophic leak develop. New energy efficient window systems could greatly reduce utility costs. All work on this project must be closely coordinated with DTMB and the building occupants. The selected firm may be asked to track the work associated with the two parts of this project separately. The Method of Contractor Selection has not been determined at this time.

Design

Municipal

$500,000.00

Public - State/Provincial

Renovation

Our team is requesting plans for this project.

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
162
Active Projects
103
Bidding Soon
1,355
All Active Projects
579
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 8, 2024

img_map_placeholder

702 W Kalamazoo St, Lansing, MI

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.