Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published May 9, 2023 at 8:00 PM
Updated January 26, 2024
Renovation of a detention facility in Pittsburgh, Pennsylvania. Completed plans call for the renovation of a detention facility.
A. Work Summary: The AHU10 Coil Replacement project is defined by the Construction Documents and Specifications. A general summary of Work is as follows: Prepare project site for a clean and safe installation. Jail operators to isolate and drain down coil. Disconnect and remove existing piping servicing existing cooling coil. Place caps on open ends of pipe to eliminate possibility of water damage while replacement occurs. Remove OEM cooling coils from unit. Remove flashing on outside of unit where coils get replaced and measure up new pieces to be fabricated. Remove any internal flashing around coils and measure up pieces that are missing so they can be installed when coils are replaced. Coil disposal by county. New coils needs to be four pieces that meet design specifications. Coil inlet and discharge must align with existing piping. New coil must fit within existing unit enclosure. Repair leak in piping connection and replace the insulation. Demo two (2) existing coils in AHU-10 and remove from site. Furnish and install new coil arrangement for AHU-10 that meet original design specifications, including any necessary modifications to drip pan and associated drain piping in between top and bottom coils. Reinstall all necessary flashing pieces around the coils, install flat metal flashing on the outside of the unit on both sides where coil is located. Last Day for Questions: Monday, March, 13, 2023 , 3:00 P.M., E.T. Questions received after this date and time may not be answered by the County. All questions must be submitted through Bonfire Replacement of the coils in Air Handling Unit #10 at the Allegheny County Jail. Question Deadline 03/15/2023 at 3:00 PM ET
Award
Jails / Prisons
$74,200.00
Public - County
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
11
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 22, 2023
April 3, 2023
950 Second Avenue, Pittsburgh, PA
Related To This Project
Pittsburgh, PA
Bid Date: Mar 06 2023
Pittsburgh, PA
Bid Date: Mar 17 2023
Pittsburgh, PA
Bid Date: Dec 10 2021
Pittsburgh, PA
Bid Date: Mar 15 2023
Pittsburgh, PA
Bid Date: May 23 2023
Pittsburgh, PA
Bid Date: Feb 21 2023
Pittsburgh, PA
Bid Date: Feb 21 2023
Pittsburgh, PA
--
Pittsburgh, PA
Bid Date: Feb 23 2023
Pittsburgh, PA
Bid Date: Mar 01 2023
Pittsburgh, PA
Bid Date: Mar 27 2019
Pittsburgh, PA
Bid Date: Oct 20 2020
Pittsburgh, PA
Bid Date: Jun 10 2020
Pittsburgh, PA
Bid Date: Nov 17 2020
Pittsburgh, PA
Bid Date: Jun 10 2020
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed