BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a detention facility in Pittsburgh, Pennsylvania. Completed plans call for the renovation of a detention facility.

A. Work Summary: The AHU10 Coil Replacement project is defined by the Construction Documents and Specifications. A general summary of Work is as follows: Prepare project site for a clean and safe installation. Jail operators to isolate and drain down coil. Disconnect and remove existing piping servicing existing cooling coil. Place caps on open ends of pipe to eliminate possibility of water damage while replacement occurs. Remove OEM cooling coils from unit. Remove flashing on outside of unit where coils get replaced and measure up new pieces to be fabricated. Remove any internal flashing around coils and measure up pieces that are missing so they can be installed when coils are replaced. Coil disposal by county. New coils needs to be four pieces that meet design specifications. Coil inlet and discharge must align with existing piping. New coil must fit within existing unit enclosure. Repair leak in piping connection and replace the insulation. Demo two (2) existing coils in AHU-10 and remove from site. Furnish and install new coil arrangement for AHU-10 that meet original design specifications, including any necessary modifications to drip pan and associated drain piping in between top and bottom coils. Reinstall all necessary flashing pieces around the coils, install flat metal flashing on the outside of the unit on both sides where coil is located. Last Day for Questions: Monday, March, 13, 2023 , 3:00 P.M., E.T. Questions received after this date and time may not be answered by the County. All questions must be submitted through Bonfire Replacement of the coils in Air Handling Unit #10 at the Allegheny County Jail. Question Deadline 03/15/2023 at 3:00 PM ET

Award

Jails / Prisons

$74,200.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

11

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
80
Active Projects
37
Bidding Soon
839
All Active Projects
326
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 22, 2023

April 3, 2023

img_map_placeholder

950 Second Avenue, Pittsburgh, PA

Related To This Project


Stop wasting time. Get and stay ahead of your competition.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.