BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Truth or Consequences, New Mexico. Completed plans call for site work for a water / sewer project.

Wilson & Company Project No. 19-600-208-00 City of T or C- DWSRF Water System Improvements 19-600-208-01 Bids for the construction of the project The Project includes the following Work: Base Bid: Installation of 3,544 LF of 8-in PVC waterline, fittings and appurtenances within public right-ofway by open trench methods and 16-in Steel Casing by trenchless methods on Marshall St, Pershing St and a section of Second St. The project also includes the installation of water service lines, connections to the existing system and site work to include roadway asphalt removal and replacement. he City's Well 1 will be updated with a new 6" Flow meter and additional 6" water line, fittings, and appurtenances and Well 2 will with an additional 6" flow meter. Additional Additive 1: The remainder of Second St will be completed with the installation of 2,753 LF of 8in PVC, fittings, appurtenances, water service lines, connections to the existing system and site work to include roadway asphalt removal and replacement. Additional Additive 2: Sierra Vista Dr will be completed with the installation of 1,227 LF of 8-in PVC, fittings, appurtenances, water service lines, connections to the existing system and site work to include roadway asphalt removal and replacement. DWSRF Water System Improvements Obtaining the Bidding Documents The Issuing Office for the Bidding Documents Prospective Bidders may obtain digital sets of the bidding documents downloaded free of charge and printed by prospective bidders from the following website. he bidder must make a good faith effort to solicit and hire Disadvantaged Business subcontractors and suppliers to meet the goals outlined in EPA XP-215. A Bid Proposal that omits XP-215 or does not support that a good faith effort was made will be considered nonresponsive and the Bid Proposal rejected.

Award

Water / Sewer

$1,025,315.00

Public - City

Site Work

32

23

13

4

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
15
Active Projects
8
Bidding Soon
133
All Active Projects
61
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

May 23, 2023

June 22, 2023

img_map_placeholder

Multiple Locations, Truth or Consequences, NM

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.