BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a sidewalk / parking lot in Pensacola, Florida. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

2023 Sidewalk Project Phase I For questions, contact 850-435-1835 or purchasing@cityofpensacola.com. The City shall have the authority to reject all bids and advertise for new bids. Any questions concerning the proposal should be addressed and submitted in writing no later than 10:00 A.M., local time, March 13, 2023 to: George Maiberger, Purchasing Manager City of Pensacola 222 W. Main St. Pensacola, FL 32502 purchasing@cityofpensacola.com The scope of this project is the installation of ADA-compliant concrete sidewalks. The efforts associated with this project include, but are not limited to, excavation, removal/replacement of existing landscaping, mailboxes, water meters, water valves, site grading, installation of form work, concrete work, and sodding. All work shall be in accordance with the general notes, specifications, and construction plans included as part of this project manual. Below is the street name and limits of work for the proposed sidewalk. The contractor shall bid this project according to the constraints of the general notes, specifications, and construction plans. A site visit to determine any unforeseen issues is strongly recommended. The lump sum maintenance of traffic item shall include all signs, devices and other costs associated with maintaining traffic during the construction including weekend work. No night work shall be permitted on this project. Complete work under this contract shall consist of installation of required erosion control features (including sandbags), cover and protect storm water inlets, installation of new sidewalks, and placement of sod. All proposed line and grade work shall be approved by the City Inspector. Contractor's work shall include the necessary coordination of all existing utilities with respective owners and to timely address any potential conflicts with required work. All sod placed shall be properly watered and maintained until permanently rooted/established to the satisfaction of the City. Maximum access shall be provided to the property owners at all times during construction. Care shall be exercised to not cause any damage to adjacent infrastructure being left in-place during reconstruction. Any such damage shall be the responsibility of the contractor. All work shall be in accordance with the standards and specifications of the City of Pensacola.

Award

Sidewalks / Parking Lot

$123,700.00

Public - City

Paving, Site Work

7

5

2

3

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
109
Active Projects
64
Bidding Soon
967
All Active Projects
433
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

March 29, 2023

April 28, 2023

July 27, 2023

img_map_placeholder

Firestone Blvd, Pensacola, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.