Published April 14, 2023 at 8:00 PM

Updated August 29, 2024

Site work and paving for a sidewalk / parking lot in Pensacola, Florida. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

2023 Sidewalk Project Phase I For questions, contact 850-435-1835 or purchasing@cityofpensacola.com. The City shall have the authority to reject all bids and advertise for new bids. Any questions concerning the proposal should be addressed and submitted in writing no later than 10:00 A.M., local time, March 13, 2023 to: George Maiberger, Purchasing Manager City of Pensacola 222 W. Main St. Pensacola, FL 32502 purchasing@cityofpensacola.com The scope of this project is the installation of ADA-compliant concrete sidewalks. The efforts associated with this project include, but are not limited to, excavation, removal/replacement of existing landscaping, mailboxes, water meters, water valves, site grading, installation of form work, concrete work, and sodding. All work shall be in accordance with the general notes, specifications, and construction plans included as part of this project manual. Below is the street name and limits of work for the proposed sidewalk. The contractor shall bid this project according to the constraints of the general notes, specifications, and construction plans. A site visit to determine any unforeseen issues is strongly recommended. The lump sum maintenance of traffic item shall include all signs, devices and other costs associated with maintaining traffic during the construction including weekend work. No night work shall be permitted on this project. Complete work under this contract shall consist of installation of required erosion control features (including sandbags), cover and protect storm water inlets, installation of new sidewalks, and placement of sod. All proposed line and grade work shall be approved by the City Inspector. Contractor's work shall include the necessary coordination of all existing utilities with respective owners and to timely address any potential conflicts with required work. All sod placed shall be properly watered and maintained until permanently rooted/established to the satisfaction of the City. Maximum access shall be provided to the property owners at all times during construction. Care shall be exercised to not cause any damage to adjacent infrastructure being left in-place during reconstruction. Any such damage shall be the responsibility of the contractor. All work shall be in accordance with the standards and specifications of the City of Pensacola.

Award

Sidewalks / Parking Lot

$123,700.00

Public - City

Paving, Site Work

7

5

2

3

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation, Execution, Application
Division 03 - Concrete

Division 03 - Concrete

Concrete Reinforcing, Reinforcing Steel
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry
Division 09 - Finishes

Division 09 - Finishes

Tiling, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Storage Specialties, Postal Specialties
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Seating, Chairs, Residential Furniture, Beds
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Driven Piles, Bored Piles
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Planting, Turf and Grasses, Sodding
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
48
Active Projects
25
Bidding Soon
500
All Active Projects
192
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 29, 2023

April 28, 2023

img_map_placeholder

Firestone Blvd, Pensacola, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.